Quick answers
What is this project?
Proposal to Allow Use of 0.2134 Ha of Forest Land for Laying of Optical Fiber Cable Work Along the Specified Road Passing Through Forest. Chikhalapada to Jhankhari Road Side ( Forest Area:- Length 4743.00 Meter, Width:0.45meter/ Hectare. 0.2134 ) is a lapsed road project in Chikhalapada, Songadh, Tapi, Gujarat. The site covers 0.5 acres.
Who is building it?
The applicant is Jio Digital Fiber Private Limited.
Has it been approved?
No. The application was lapsed on 28 Feb 2024, so it is no longer under consideration.
Where is it?
In Chikhalapada, Songadh, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹20 lakh; a site of 0.5 acres and 2,130 m² of forest land.
When was it filed?
The application was filed on 10 Jan 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposal to Allow Use of 0.2134 Ha of Forest Land for Laying of Optical Fiber Cable Work…
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Feb 2024 |
| Application filed | 10 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Jio Digital Fiber Private Limited |
| Land area | 2,100 m² |
| Forest land | 2,130 m² |
| Project cost | ₹20 lakh |
| Village / locality | Chikhalapada |
| Taluk / tehsil | Songadh |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13018 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Dec 2023 | Forest land use approved | 0.5 acres | ₹20 lakh |
| New project filed 10 Jan 2023 (this page) | Lapsed | 0.5 acres | ₹20 lakh |
In context
16 applications in Tapi since January 2022 are in the same category (Roads & highways): 4 approved, 7 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.5 acres, this one is larger than 50% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chikhalapada, Songadh, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal to Allow Use of 0.2134 Ha of Forest Land for Laying of Optical Fiber… — forest land use approved, 0 m away
- Shri Rameshbhai Bhaijibhai Oad, Re-appraisal of Environment Clearance granted… — lapsed, 3.9 km away
- Shri Makanjibhai Virjibhai Gamit — lapsed, 4.9 km away
- Shri Dipakbhai Ranchhodbhai Oad Re-appraisal Area-4.36.20 Survey no. – 167,… — lapsed, 4.9 km away
- Diversion of 0.00135 Hectors Reserved Forest Land for the Grant of Permission… — forest land use approved, 4.9 km away
- Tapi 4G Saturation Khogal Gam village — forest land use approved, 5.1 km away
- Naynaben Dipakbhai Oad Re-appraisal Area-2.65.00 Survey no. – 194 to 238 ne… — lapsed, 5.1 km away
- Tapi 4G Sat VVIP2 — forest land use approved, 5.2 km away
More from Jio Digital Fiber Private Limited in Tapi
- Permission to Lay Optical Fiber Cable Along the Road From Antapur Village to… — lapsed
- Grant of Permission to Lay Optical Fiber Cable Along the Road From Dolvan… — forest land use approved
4 Jio Digital Fibre projects in Tapi
All 787 Jio Digital Fibre projects across India