What is this project?
Proposal to Allow Use of 0.2134 Ha of Forest Land for Laying of Optical Fiber Cable Work Along the Specified Road Passing Through Forest. Chikhalapada to Jhankhari Road Side (Forest Area:- Length 4743.00 Meter, Width:0.45meter/ Hectare. 0.2134) is an approved telecom project in Chikhalapada, Songadh, Tapi, Gujarat. The site covers 0.5 acres.
Who is building it?
The applicant is Jio Digital Fiber Private Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 30 Jun 2025), as of 27 Nov 2026.
Where is it?
In Chikhalapada, Songadh, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹20 lakh; a site of 0.5 acres and 2,130 m² of forest land.
When was it filed?
The application was filed on 1 Dec 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 30 Jun 2025 |
| Application filed | 1 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Jio Digital Fiber Private Limited |
| Land area | 2,100 m² |
| Forest land | 2,130 m² |
| Project cost | ₹20 lakh |
| Village / locality | Chikhalapada |
| Taluk / tehsil | Songadh |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14350 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Dec 2023 (this page) | Forest land use approved | 0.5 acres | ₹20 lakh |
| New project filed 10 Jan 2023 | Lapsed | 0.5 acres | ₹20 lakh |
In context
24 applications in Tapi since January 2022 are in the same category (Telecom): 9 approved, 4 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.5 acres, this one is smaller than 71% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chikhalapada, Songadh, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal to Allow Use of 0.2134 Ha of Forest Land for Laying of Optical Fiber… — lapsed, 0 m away
- Shri Rameshbhai Bhaijibhai Oad, Re-appraisal of Environment Clearance granted… — lapsed, 3.9 km away
- Shri Makanjibhai Virjibhai Gamit — lapsed, 4.9 km away
- Shri Dipakbhai Ranchhodbhai Oad Re-appraisal Area-4.36.20 Survey no. – 167,… — lapsed, 4.9 km away
- Diversion of 0.00135 Hectors Reserved Forest Land for the Grant of Permission… — forest land use approved, 4.9 km away
- Tapi 4G Saturation Khogal Gam village — forest land use approved, 5.1 km away
- Naynaben Dipakbhai Oad Re-appraisal Area-2.65.00 Survey no. – 194 to 238 ne… — lapsed, 5.1 km away
- Tapi 4G Sat VVIP2 — forest land use approved, 5.2 km away
More from Jio Digital Fiber Private Limited in Tapi
- Permission to Lay Optical Fiber Cable Along the Road From Antapur Village to… — lapsed
- Grant of Permission to Lay Optical Fiber Cable Along the Road From Dolvan… — forest land use approved
4 Jio Digital Fibre projects in Tapi
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.