Grant of Permission to Lay Optical Fiber Cable Along the Road From Dolvan Village to Unai Village Road Side is an approved telecom project in Dolvan, Vyara, Tapi, Gujarat. The site covers 0.7 acres. Its stated project cost is ₹20 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 3 Jan 2024).

See it on the live map All projects in Tapi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Grant of Permission to Lay Optical Fiber Cable Along the Road From Dolvan Village to Unai Village Road Side is an approved telecom project in Dolvan, Vyara, Tapi, Gujarat. The site covers 0.7 acres.

Who is building it?

The applicant is Jio Digital Fiber Private Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 3 Jan 2024), as of 27 Nov 2026.

Where is it?

In Dolvan, Vyara, Tapi, Gujarat.

How big is it?

It has a stated cost of ₹20 lakh; a site of 0.7 acres and 3,020 m² of forest land.

When was it filed?

The application was filed on 21 Mar 2023.

Project details

Official titleProposal for Grant of Permission to Lay Optical Fiber Cable Along the Road From Dolvan Village to Unai Village Road Side in Tapi District. (Forest Area:- Length 6717 Meter, Width :- 0.45 Mtr, Total:- 0.3023 Ha)
StatusForest land use approved
Status since3 Jan 2024
Application filed21 Mar 2023
Approval soughtForest land use
Application typeNew project
SectorTelecom
ApplicantJio Digital Fiber Private Limited
Land area3,000 m²
Forest land3,020 m²
Project cost₹20 lakh
Village / localityDolvan
Taluk / tehsilVyara
DistrictTapi
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-14429

In context

24 applications in Tapi since January 2022 are in the same category (Telecom): 9 approved, 4 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.7 acres, this one is smaller than 62% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dolvan, Vyara, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jio Digital Fiber Private Limited in Tapi

4 Jio Digital Fibre projects in Tapi
All 787 Jio Digital Fibre projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.