Quick answers
What is Juni Bavli Pumped Storage Hydro Electric Project (450 MW)?
Juni Bavli Pumped Storage Hydro Electric Project (450 MW) is a proposed power project in Kuyala, Sagbara, Narmada, Gujarat.
Who is building it?
The applicant is Gujarat State Electricity Corporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kuyala, Sagbara, Narmada, Gujarat.
How big is it?
It has a stated cost of ₹1,979.9 crore.
When was it filed?
The application was filed on 13 Oct 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 13 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat State Electricity Corporation Limited |
| Project cost | ₹1,979.9 crore |
| Village / locality | Kuyala |
| Taluk / tehsil | Sagbara |
| District | Narmada |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13075 |
In context
15 applications in Narmada since January 2022 are in the same category (Power): 1 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected.
Where it is
Kuyala, Sagbara, Narmada, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation USOF Project Devsaki village Sagbara — forest land use approved, 14.7 km away
- Narmada 4G Saturation USOF project VVIP Case — more information requested, 19.7 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed, 23.5 km away
- Diversion of Forest Land of 2.8392 Hac for forest clearance for Supply,… — initial checks, 23.8 km away
- Diversion of 0.036 Ha. Protected forest area for Construction of Box Culvert… — more information requested, 24.2 km away
- Diversion of 0.129 Ha. Protected forest area for Construction of Temporary… — lapsed, 24.2 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed, 24.9 km away
- Diversion of 0.090 Ha. Protected Forest Land for Construct Approach road for… — forest land use approved, 25.8 km away
More from Gujarat State Electricity Corporation Limited in Narmada
- 1000 MW Motaraypura Pumped Storage Project — application filed
All 25 Gujarat State Electricity Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.