Quick answers
What is this project?
Diversion Roadside Protected Forest land for the laying of Underground Water Pipeline from Tappar Dam to Nirona Dam in favor of Executive engineer, Salinity Control Division Bhuj is an approved road project in Chandrani, Anjar, Kachchh, Gujarat. The site covers 1.4 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 20 Feb 2025), as of 27 Nov 2026.
Where is it?
In Chandrani, Anjar, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹1 crore; a site of 1.4 acres and 1.4 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 26 Apr 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 20 Feb 2025 |
| Application filed | 26 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Department of Irrigation |
| Land area | 1.4 acres (0.6 ha) |
| Forest land | 1.4 acres (0.6 ha) |
| Project cost | ₹1 crore |
| Village / locality | Chandrani |
| Taluk / tehsil | Anjar |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14408 |
In context
76 applications in Kachchh since January 2022 are in the same category (Roads & highways): 23 approved, 32 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.4 acres, this one is larger than 51% of them.
111 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandrani, Anjar, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Xtron Industries — under environmental review, 800 m away
- Diversion Roadside Protected Forest Land for the Construction of Approach Road — forest land use approved, 1.3 km away
- Shri Gokul Vala Jatiya — environmental approval granted, 1.5 km away
- Shri Gokul Vala Jatiya — cleared for impact study, 1.5 km away
- 8" Steel Gas Pipeline Connectivity from BK to Dwarkesh Petroleum Ta: Bhuj Dist… — forest land use approved, 1.6 km away
- 63/125 MM Dia PE Gas Pipeline For Catering Domestic, Commercial & Industrial… — forest land use approved, 1.7 km away
- Dangar Bhura Rana — under environmental review, 1.7 km away
- Construction of Approach Road Through the Roadside Protected Forest — forest land use approved, 1.8 km away
More from Department of Irrigation in Kachchh
- Providing Irrigation Water Facility and filling various tanks of Khadir Region… — under forest review
- Epc Work for Construction of Pipeline Project From Tappar Dam to Nirona Dam… — more information requested
- EPC works for Pipeline Project from MPS-3 — more information requested
- Diversion of Forest Land for Saran Sarovar Project in Ta: Rapar, Dist: Kutch — under forest review
- Diversion of Forest Land for Saran Sarovar Project in Ta: Rapar, Dist: Kutch… — not approved
- Laying of Under Ground Water Pipeline for the Irrigation Purpose — under wildlife review
13 Department of Irrigation, Gujarat projects in Kachchh
All 42 Department of Irrigation, Gujarat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.