Quick answers
What is Proposed Petrol pump Approach Road.?
Proposed Petrol pump Approach Road is a lapsed road project in Kidotar, Amirgadh, Banas Kantha, Gujarat. The site covers 1.3 acres.
Who is building it?
The applicant is Patel Sumitkumar Dineshbhai.
Has it been approved?
No. The application was lapsed on 9 Aug 2026, so it is no longer under consideration.
Where is it?
In Kidotar, Amirgadh, Banas Kantha, Gujarat.
How big is it?
It has a stated cost of ₹35 lakh; a site of 1.3 acres and 1.3 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 4 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Aug 2026 |
| Application filed | 4 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Patel Sumitkumar Dineshbhai |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 1.3 acres (0.5 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Kidotar |
| Taluk / tehsil | Amirgadh |
| District | Banas Kantha |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13259 |
In context
50 applications in Banas Kantha since January 2022 are in the same category (Roads & highways): 1 approved, 32 filed or under review, and 17 withdrawn, lapsed or rejected. At 1.3 acres, this one is smaller than 85% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kidotar, Amirgadh, Banas Kantha, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Entry & Exit Approach Road. — lapsed, 450 m away
- Fuel station by Reliance Jio BP Mobility Limited — lapsed, 500 m away
- Diversion of 0.0041 Ha Protected Forest land for laying of Proposed 11 KV HT… — lapsed, 3.8 km away
- Proposed Entry & Exit Road At Awal farm survey No-192 and 191 Land — under forest review, 5.2 km away
- NMC Base Pipeline Project — lapsed, 5.5 km away
- NMC Base Pipeline Project-2 — more information requested, 5.5 km away
- NMC Base Pipeline Project — more information requested, 5.5 km away
- Khapa Ghoda Road — more information requested, 7.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.