Quick answers
What is Proposed Entry & Exit Approach Road.?
Proposed Entry & Exit Approach Road is a lapsed road project in Kidotar, Amirgadh, Banas Kantha, Gujarat. The site covers 0.8 acres.
Who is building it?
The applicant is Govindkumar Patel.
Has it been approved?
No. The application was lapsed on 22 Sept 2026, so it is no longer under consideration.
Where is it?
In Kidotar, Amirgadh, Banas Kantha, Gujarat.
How big is it?
It has a stated cost of ₹20 lakh; a site of 0.8 acres and 3,400 m² of forest land.
When was it filed?
The application was filed on 9 Feb 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Sept 2026 |
| Application filed | 9 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Govindkumar Patel |
| Land area | 3,400 m² |
| Forest land | 3,400 m² |
| Project cost | ₹20 lakh |
| Village / locality | Kidotar |
| Taluk / tehsil | Amirgadh |
| District | Banas Kantha |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13680 |
In context
50 applications in Banas Kantha since January 2022 are in the same category (Roads & highways): 1 approved, 32 filed or under review, and 17 withdrawn, lapsed or rejected. At 0.8 acres, this one is smaller than 87% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kidotar, Amirgadh, Banas Kantha, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Fuel station by Reliance Jio BP Mobility Limited — lapsed, 50 m away
- Proposed Petrol pump Approach Road. — lapsed, 450 m away
- Diversion of 0.0041 Ha Protected Forest land for laying of Proposed 11 KV HT… — lapsed, 4.3 km away
- NMC Base Pipeline Project — lapsed, 5.1 km away
- NMC Base Pipeline Project-2 — more information requested, 5.1 km away
- NMC Base Pipeline Project — more information requested, 5.1 km away
- Proposed Entry & Exit Road At Awal farm survey No-192 and 191 Land — under forest review, 5.6 km away
- Khapa Ghoda Road — more information requested, 7.3 km away
More from Govindkumar Patel in Banas Kantha
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.