Quick answers
What is NMC Base Pipeline Project-2?
NMC Base Pipeline Project-2 is a proposed pipeline project in Ajapur Vanka, Amirgadh, Banas Kantha, Gujarat. The site covers 17.3 acres.
Who is building it?
The applicant is Deepak Singh.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Ajapur Vanka, Amirgadh, Banas Kantha, Gujarat.
How big is it?
It has a stated cost of ₹117 crore and a site of 17.3 acres.
When was it filed?
The application was filed on 7 Dec 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 7 Dec 2023 |
| Application filed | 7 Dec 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Deepak Singh |
| Land area | 17.3 acres (7 ha) |
| Project cost | ₹117 crore |
| Village / locality | Ajapur Vanka |
| Taluk / tehsil | Amirgadh |
| District | Banas Kantha |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14556 |
In context
14 applications in Banas Kantha since January 2022 are in the same category (Pipelines): 1 approved, 8 filed or under review, and 5 withdrawn, lapsed or rejected. At 17.3 acres, this one is larger than 57% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ajapur Vanka, Amirgadh, Banas Kantha, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- NMC Base Pipeline Project — more information requested, 0 m away
- NMC Base Pipeline Project — lapsed, 0 m away
- Fuel station by Reliance Jio BP Mobility Limited — lapsed, 5.1 km away
- Proposed Entry & Exit Approach Road. — lapsed, 5.1 km away
- Proposed Petrol pump Approach Road. — lapsed, 5.5 km away
- Khapa Ghoda Road — more information requested, 7.4 km away
- Khapa Ghoda Road — lapsed, 7.4 km away
- Banaskantha 4G Sat USOF — lapsed, 8.4 km away
More from Deepak Singh in Banas Kantha
- NMC Base Pipeline Project — more information requested
- NMC Base Pipeline Project — lapsed
About this information