Quick answers
What is North Valsad 4G Sat USO?
North Valsad 4G Sat USO is a lapsed project in Avalkhandi, Dharampur, Valsad, Gujarat. The site covers 0.5 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 4 Mar 2023, so it is no longer under consideration.
Where is it?
In Avalkhandi, Dharampur, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹14.6 crore; a site of 0.5 acres and 2,200 m² of forest land.
When was it filed?
The application was filed on 29 May 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 4 Mar 2023 |
| Application filed | 29 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 2,200 m² |
| Forest land | 2,200 m² |
| Project cost | ₹14.6 crore |
| Village / locality | Avalkhandi |
| Taluk / tehsil | Dharampur |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13260 |
In context
33 applications in Valsad since January 2022 are in the same category (Other): 3 approved, 23 filed or under review, and 7 withdrawn, lapsed or rejected. At 0.5 acres, this one is smaller than 84% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Avalkhandi, Dharampur, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- North Valsad 4G Sat USOF — more information requested, 0 m away
- Dharampur Pumped Storage Project of Capacity 1500 MW — returned to applicant, 5.7 km away
- Pindval Pumped Storage Project (1000 MW) — cleared for impact study, 5.7 km away
- Pindval Pumped Storage Project (1000 MW) — cleared for impact study, 5.9 km away
- 4G USO saturation Project BSNL — more information requested, 10.7 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed, 11.4 km away
- Proposal of Reserved Forest Land for Bharti Airtel Limited (Airtel)… — more information requested, 12.1 km away
- Diversion of Reserve Forest Land for Widening of Dhamni - Tokarpada Road (MDR)… — under forest review, 15.7 km away
More from Mahesh Nair in Valsad
- Amended Bharat Net/BSNL Linear UG OFC laying Project in VALSAD (DNH BLOCK) — initial checks
- Project at Valsad for laying OF cable for BSNL 4G Tower — lapsed
- South Valsad 4G Sat USOF Revised — forest land use approved
- South Valsad 4G Sat USOF — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.