Quick answers
What is this project?
66kV line from proposed 220kV Bhesan S/S to existing 66kV Bhesan S/S by laying of 66kV 630 SQ.MM. UG cable under Kisan Suryoday Yojna is an approved building project in Bhesana, Bhesan, Junagadh, Gujarat. The site covers 0.4 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corporation Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 10 Feb 2026), as of 27 Nov 2026.
Where is it?
In Bhesana, Bhesan, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹9 crore; a site of 0.4 acres and 1,730 m² of forest land.
When was it filed?
The application was filed on 23 Dec 2022.
Project details
| Official title | Construction of 66kV line from proposed 220kV Bhesan S/S to existing 66kV Bhesan S/S by laying of 66kV 630 SQ.MM. UG cable under Kisan Suryoday Yojna at village Bhesan Taluka Bhesan. |
|---|---|
| Status | Forest land use approved |
| Status since | 10 Feb 2026 |
| Application filed | 23 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gujarat Energy Transmission Corporation Limited |
| Use | Other |
| Land area | 1,700 m² |
| Forest land | 1,730 m² |
| Plot area | 1,734 m² (18,665 sq ft) |
| Project cost | ₹9 crore |
| Village / locality | Bhesana |
| Taluk / tehsil | Bhesan |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13315 |
In context
21 applications in Junagadh since January 2022 are in the same category (Buildings & townships): 8 approved, 9 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 23 months from filing to approval. At 0.4 acres, this one is smaller than 70% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhesana, Bhesan, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0385 Hec. Protected Forest Land for Construction of New 220KV… — forest land use approved, 1.7 km away
- Diversion of 0.077 Hec. Protected Forest Land for Construction of New 220KV… — forest land use approved, 2 km away
- Laying UG OFC cable in Bhesan taluka of Junagadh Dist. Gujarat State — lapsed, 2.6 km away
- Kanabhai Nathubhai Pampania (Goriviyali Blacktrap 1.29.50) — environmental approval granted, 12.8 km away
- KESHUBHAI MULUBHAI GAREJA(Goriviyali 115p3) — environmental approval granted, 12.9 km away
- Bhimshi Markhi Karmur (GORVIYALI BLACKTRAP MINE) — lapsed, 13 km away
- Laying UG OFC Cable along Bhesan-Bilakha road of Junagadh dist. — lapsed, 13.2 km away
- Electrification of Shree Chanabhai Khimabhai — more information requested, 13.7 km away
More from Gujarat Energy Transmission Corporation Limited in Junagadh
- Diversion of 0.1155 Hec. of protected forest land for construction of new… — lapsed
- Diversion of 0.1295 Hec. protected forest land for construction of new 220kV… — lapsed
- Diversion of 0.1085 Hec. of Protected Forest Land for Construction of New… — lapsed
- Diversion of 0.0385 Hec. Protected Forest Land for Construction of New 220KV… — forest land use approved
- Diversion of 0.077 Hec. Protected Forest Land for Construction of New 220KV… — forest land use approved
- Diversion of 0.3360 Hec. of Protected Forest Land for Construction of New 66KV… — forest land use approved
9 Gujarat Energy Transmission Corporation projects in Junagadh
All 38 Gujarat Energy Transmission Corporation projects across India