Quick answers
What is this project?
Diversion of Protected Forest land for the laying of Proposed Underground Water Pipeline (Package-I) in favor of Gujarat Water Supply & Sewerage Board, Public Health Sanitary Sub Division Bhachau of Kutch district of the state of Gujarat is an approved pipeline project in Bandhadi, Bhachau, Kachchh, Gujarat. The site covers 2.1 acres.
Who is building it?
The applicant is Gujarat Water Supply & Sewerage Board, P.H..S Sub Dn. No.1 Naliya.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 24 Sept 2024), as of 27 Nov 2026.
Where is it?
In Bandhadi, Bhachau, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹80 lakh; a site of 2.1 acres and 2.1 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 4 Apr 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 24 Sept 2024 |
| Application filed | 4 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Water Supply & Sewerage Board, P.H..S Sub Dn. No.1 Naliya |
| Land area | 2.1 acres (0.9 ha) |
| Forest land | 2.1 acres (0.9 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Bandhadi |
| Taluk / tehsil | Bhachau |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13395 |
In context
59 applications in Kachchh since January 2022 are in the same category (Pipelines): 21 approved, 25 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.1 acres, this one is larger than 56% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bandhadi, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Drinking Water Pipeline Parallel to Lodheshwar Chowkdi to Mai HW and… — lapsed, 0 m away
- Widening and Strengthening of Bhachau-Rapar-Adesar Road — more information requested, 50 m away
- Permission for Diversion of 0.4106 Ha Roadside Protected Forest land of… — more information requested, 2.6 km away
- Industrial project by M/s. Tirth Son Formalin — environmental approval granted, 5.3 km away
- Industrial project by M/s. Tirth Son Formalin — returned to applicant, 5.3 km away
- Industrial project by M/s. Tirth Son Formalin — cleared for impact study, 5.3 km away
- Expansion for Proposed Project of Synthetic Organic Chemicals (Resin)… — environmental approval granted, 5.6 km away
- Expansion for Proposed Project of Synthetic Organic Chemicals (Resin)… — environmental approval granted, 5.6 km away
More from Gujarat Water Supply & Sewerage Board, P.H..S Sub Dn. No.1 Naliya in Kachchh
- Diversion of Forest land of Village: Laiyari( Ta: Abdasa) and Village: Maniara… — more information requested
- Diversion of 0.3490 Ha Forest Land of Naliya Narayansarovar Road for Laying of… — more information requested
- Diversion of 0.4627 Ha Forest land of Naliya Narayansarovar Road for laying of… — more information requested
- Diversion of Forest land for the laying of Proposed Underground Water Pipeline… — forest land use approved
- Diversion of Forest Land for Laying of Underground Water Pipeline and… — forest land use approved
- Laying of Underground Water Pipeline to Roadside Forest of Bhuj Khavada Road — more information requested
All 28 Gujarat Water Supply & Sewerage Board, P.H..S Sub Dn. No.1 Naliya projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.