Quick answers
What is this project?
90 mm Dia MDPE Gas Pipeline route Anjani Spintex Pvt. Ltd. Connectivity At.: Botad, Dist: Botad is an approved pipeline project in Botad, Gujarat. It seeks 0 acres of forest land.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 26 Oct 2023), as of 27 Nov 2026.
Where is it?
In Botad, Gujarat.
How big is it?
It has a stated cost of ₹10 lakh and 10 m² of forest land.
When was it filed?
The application was filed on 6 Jan 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 26 Oct 2023 |
| Application filed | 6 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Forest land | 10 m² |
| Project cost | ₹10 lakh |
| Village / locality | Botad |
| Taluk / tehsil | Botad |
| District | Botad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13583 |
In context
9 applications in Botad since January 2022 are in the same category (Pipelines): 6 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Botad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.17432 HA. of PF land for Connectivity From Botad Aluminium LLP… — lapsed, 1.8 km away
- 90 mm PE Gas Pipeline Connectivity To Manav Mandir Mand Budhhi Seva Trust, Ta:… — forest land use approved, 1.9 km away
- Diversion of 0.04 Ha. of Protected Forest Land, I.E., Roadside Strip… — lapsed, 3 km away
- 90 mm PE Gas Pipeline Connectivity To Alka Ashutosh Patel Farm House, Ta: Botad — forest land use approved, 3.2 km away
- Upgradation of Existing 2-Lane to 4-Lane of Barwala-Sarangpur-Botad Road… — initial checks, 3.3 km away
- 6" Dia Steel pipeline connectivity to Franchisee CNG Station m/s Dharmanandan… — forest land use approved, 4.5 km away
- Laying 8" dia. underground Steel Gas Pipeline from Receiving Station… — forest land use approved, 6.3 km away
- Proposed New Bio-Medical Waste Treatment Facility at Survey No.: 45, Moje:… — cleared for impact study, 7.9 km away
More from Gujarat Gas Limited in Botad
- Diversion of 0.04 Ha. of Protected Forest Land, I.E., Roadside Strip… — lapsed
- Diversion of 0.17432 HA. of PF land for Connectivity From Botad Aluminium LLP… — lapsed
- 90 mm PE Gas Pipeline Connectivity To Manav Mandir Mand Budhhi Seva Trust, Ta:… — forest land use approved
- 90 mm PE Gas Pipeline Connectivity To Alka Ashutosh Patel Farm House, Ta: Botad — forest land use approved
- 6" Dia Steel pipeline connectivity to Franchisee CNG Station m/s Dharmanandan… — forest land use approved
6 Gujarat Gas projects in Botad
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.