Quick answers
What is this project?
Upgradation of Existing 2-Lane to 4-Lane of Barwala-Sarangpur-Botad Road (SH-118) From Km.0/0 to 22/500 (Working Section: 20+240 to 19+260 & 17+900 to 17+510 Km.) (Length 22.500 KM) Dist.- Botad, State-Gujarat is a proposed road project in Sherthali, Botad, Gujarat. The site covers 6.3 acres.
Who is building it?
The applicant is Executive Engineer, R&b Division Botad.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Sherthali, Botad, Gujarat.
How big is it?
It has a stated cost of ₹12 lakh; a site of 6.3 acres and 6.3 acres (2.5 ha) of forest land.
When was it filed?
The application was filed on 28 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 28 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer, R&b Division Botad |
| Land area | 6.3 acres (2.5 ha) |
| Forest land | 6.3 acres (2.5 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Sherthali |
| Taluk / tehsil | Botad |
| District | Botad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14274 |
In context
6 applications in Botad since January 2022 are in the same category (Roads & highways): 3 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sherthali, Botad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.04 Ha. of Protected Forest Land, I.E., Roadside Strip… — lapsed, 950 m away
- 90 mm PE Gas Pipeline Connectivity To Manav Mandir Mand Budhhi Seva Trust, Ta:… — forest land use approved, 3.2 km away
- 90 mm Dia MDPE Gas Pipeline route Anjani Spintex Pvt. Ltd. Connectivity At.:… — forest land use approved, 3.3 km away
- 90 mm PE Gas Pipeline Connectivity To Alka Ashutosh Patel Farm House, Ta: Botad — forest land use approved, 4.2 km away
- Proposed New Bio-Medical Waste Treatment Facility at Survey No.: 45, Moje:… — cleared for impact study, 4.6 km away
- Diversion of 0.17432 HA. of PF land for Connectivity From Botad Aluminium LLP… — lapsed, 5 km away
- 6" Dia Steel pipeline connectivity to Franchisee CNG Station m/s Dharmanandan… — forest land use approved, 6.7 km away
- Laying 8" dia. underground Steel Gas Pipeline from Receiving Station… — forest land use approved, 9.3 km away
More from Executive Engineer, R&b Division Botad in Botad
- conversion of existing 2-lane to 4-Lane of Botad-Sayla Road SH-21 — in-principle approval, conditions pending
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.