Quick answers
What is this project?
Proposed New Bio-Medical Waste Treatment Facility at Survey No.: 45, Moje: Refada, Ta.: Barwala, Dist.: Botad, Gujarat-382255. by M/S. Medicare Bmw Disposal System is a proposed waste management project in Refda, Barwala, Botad, Gujarat. The site covers 5.5 acres.
Who is building it?
The applicant is Medicare Bmw Disposal System.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 Nov 2023), as of 27 Nov 2026.
Where is it?
In Refda, Barwala, Botad, Gujarat.
How big is it?
It has a stated cost of ₹7.3 crore and a site of 5.5 acres.
When was it filed?
The application was filed on 21 Nov 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Nov 2023 |
| Application filed | 21 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Medicare Bmw Disposal System |
| Land area | 5.5 acres (2.2 ha) |
| Project cost | ₹7.3 crore |
| Village / locality | Refda |
| Taluk / tehsil | Barwala |
| District | Botad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00646 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Refda, Barwala, Botad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Upgradation of Existing 2-Lane to 4-Lane of Barwala-Sarangpur-Botad Road… — initial checks, 4.6 km away
- Diversion of 0.04 Ha. of Protected Forest Land, I.E., Roadside Strip… — lapsed, 5 km away
- 90 mm PE Gas Pipeline Connectivity To Manav Mandir Mand Budhhi Seva Trust, Ta:… — forest land use approved, 7.6 km away
- 90 mm Dia MDPE Gas Pipeline route Anjani Spintex Pvt. Ltd. Connectivity At.:… — forest land use approved, 7.9 km away
- 90 mm PE Gas Pipeline Connectivity To Alka Ashutosh Patel Farm House, Ta: Botad — forest land use approved, 8.3 km away
- Diversion of 0.17432 HA. of PF land for Connectivity From Botad Aluminium LLP… — lapsed, 9.5 km away
- 6" Dia Steel pipeline connectivity to Franchisee CNG Station m/s Dharmanandan… — forest land use approved, 10.5 km away
- 66KV Lilo to 66KV Zamrala Ss From 66KV Lathidad-Keriya Line With Laying of 1c… — more information requested, 12 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.