Quick answers
What is 70 MW Wind Power Project?
70 MW Wind Power Project is a proposed power project in Adala, Sayla, Surendranagar, Gujarat. The site covers 3,494.2 acres.
Who is building it?
The applicant is Juniper Green Beam Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Adala, Sayla, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹2 crore; a site of 3,494.2 acres and 1.5 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 6 Jan 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 15 Dec 2025 |
| Application filed | 6 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Juniper Green Beam Private Limited |
| Land area | 3,494.2 acres (1,414 ha) |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹2 crore |
| Village / locality | Adala |
| Taluk / tehsil | Sayla |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13656 |
In context
15 applications in Surendranagar since January 2022 are in the same category (Power): 4 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. At 3,494.2 acres, this one is larger than 86% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Adala, Sayla, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 33 KV S/C Overhead Transmission Line for Wind Project of 150 MW — forest land use approved, 3.4 km away
- Laying Irrigation Under Ground Water Pipeline for Filling of Various… — in-principle approval, conditions pending, 4.8 km away
- Proposed Expansion of Tsdf-Landfill Within an Integrated Common Haz. Waste… — environmental approval granted, 8.4 km away
- Proposed Expansion of Tsdf-Landfill Within an Integrated Common Haz. Waste… — lapsed, 8.4 km away
- Ajitbhai Bhikhubhai Gohil — under environmental review, 11 km away
- Shri randir Bechubhai Baradiya — withdrawn, 12.4 km away
- Shri Dhadhal Raghuvirbhai Gabharubhai Block-A — environmental approval granted, 12.4 km away
- Acme Shapar Project — forest land use approved, 12.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.