Quick answers
What is this project?
33 KV S/C Overhead Transmission Line for Wind Project of 150 MW is an approved power project in Ratadki, Sayla, Surendranagar, Gujarat. The site covers 179 acres.
Who is building it?
The applicant is Acme Pokhran Solar Private Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 12 Nov 2025), as of 27 Nov 2026.
Where is it?
In Ratadki, Sayla, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹50 lakh; a site of 179 acres and 6.3 acres (2.6 ha) of forest land.
When was it filed?
The application was filed on 25 Mar 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 12 Nov 2025 |
| Application filed | 25 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Acme Pokhran Solar Private Limited |
| Land area | 179 acres (72.4 ha) |
| Forest land | 6.3 acres (2.6 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Ratadki |
| Taluk / tehsil | Sayla |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14121 |
In context
15 applications in Surendranagar since January 2022 are in the same category (Power): 4 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. At 179 acres, this one is larger than 57% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ratadki, Sayla, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying Irrigation Under Ground Water Pipeline for Filling of Various… — in-principle approval, conditions pending, 2.1 km away
- 70 MW Wind Power Project — more information requested, 3.4 km away
- Ajitbhai Bhikhubhai Gohil — under environmental review, 7.8 km away
- Acme Shapar Project — forest land use approved, 10.4 km away
- Proposed Expansion of Tsdf-Landfill Within an Integrated Common Haz. Waste… — environmental approval granted, 10.9 km away
- Proposed Expansion of Tsdf-Landfill Within an Integrated Common Haz. Waste… — lapsed, 10.9 km away
- Shri Chhanabhai Zinabhai Katudia — initial checks, 11 km away
- Shri Manish Singh (Sejakpar Ordinary Sand Block- A) — under environmental review, 11.1 km away
More from Acme Pokhran Solar Private Limited in Surendranagar
- Acme Shapar Project — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.