Quick answers
What is this project?
Works of Providing, Supplying, Lowering, Laying and Jointing various MS/DI/HDPE/PVC Rising Main and Gravity Main Pipelines, RCC ESR, RCC Sump, HGLR, Pump House, Supplying and erecting Pumping Machinery at Various SHWs under Reformation of Bordi group under Sihor Zone WSS. Taluka: Sihor Dist.: Bhavnagar, Gujarat is a lapsed pipeline project in Sihor (M), Sihor, Bhavnagar, Gujarat. The site covers 5.3 acres.
Who is building it?
The applicant is Ee Radhanpur Gwssb.
Has it been approved?
No. The application was lapsed on 2 Dec 2025, so it is no longer under consideration.
Where is it?
In Sihor (M), Sihor, Bhavnagar, Gujarat.
How big is it?
It has a stated cost of ₹10.4 crore; a site of 5.3 acres and 3,900 m² of forest land.
When was it filed?
The application was filed on 27 Jul 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Works of Providing, Supplying, Lowering, Laying and Jointing various MS/DI/HDPE/PVC…
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Dec 2025 |
| Application filed | 27 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Ee Radhanpur Gwssb |
| Land area | 5.3 acres (2.1 ha) |
| Forest land | 3,900 m² |
| Project cost | ₹10.4 crore |
| Village / locality | Sihor (M) |
| Taluk / tehsil | Sihor |
| District | Bhavnagar |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-13773 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 May 2024 | In-principle approval, conditions pending | 2.1 acres | ₹10.4 crore |
| New project filed 27 Jul 2023 (this page) | Lapsed | 5.3 acres | ₹10.4 crore |
In context
19 applications in Bhavnagar since January 2022 are in the same category (Pipelines): 10 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 5.3 acres, this one is larger than 81% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sihor (M), Sihor, Bhavnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Works of Providing, Supplying, Lowering, Laying and Jointing various… — in-principle approval, conditions pending, 100 m away
- Mer Kantaben Bharatbhai , Dhrupka Blacktrap for an area 03.99.98 Hect at… — lapsed, 2.2 km away
- Mehulbhai Dhanjibhai Baraiya Blacktrap Mine project Survey No.87/1 Paki — returned to applicant, 3 km away
- 4" Steel Gas pipeline for DRS Installation at Shihor Ta: Shihor Dist: Bhavnagar — lapsed, 3.6 km away
- Diversion of 0.5280 Ha. Road Side Protected Forest Land for Construction of… — forest land use approved, 3.6 km away
- 4" Steel Gas pipeline for DRS Installation at Shihor Ta: Shihor Dist: Bhavnagar — forest land use approved, 3.8 km away
- Rajesh Dhanjibhai Baraiya , Bhadli Blcktrap Block-E for an area 01.00.00Hect.… — lapsed, 4 km away
- Proposed Active Pharmaceutical Ingredient (API) manufacturing unit of M/s.… — environmental approval granted, 4.1 km away
More from Ee Radhanpur Gwssb in Bhavnagar
- Providing & supplying, Lowering Laying and Jointing 250 mm PVC 6 Kg/cm2 Pipe… — more information requested
- Patna Regional Water Supply Scheme, Taluka: Vallabhipur/ Bhavnagar/ Botad,… — more information requested
- Patna Regional Water Supply Scheme, Taluka: Vallabhipur/ Bhavnagar/ Botad,… — lapsed
- PERMISSION FOR LAYING OF 250 MM PVC 6 KG/CM2 PIPE LINE FOR MALANKA VILLAGE.… — lapsed
- Design Construction and O&m of 310 M3/Hr Capacity Water Treatment Plnat at… — forest land use approved
- Chorvadla Zone Augmantation — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.