Forest land use approvedPipelines · Bhavnagar, Gujarat

Design Construction and O&m of 310 M3/Hr Capacity Water Treatment Plnat at Bhilwas Hw and 844 M3/Hr at Capacity Water Treatment Plnat, Providing, Supplying Lowering and Laying & Jointing 350mm, 400mm,450mm and 600mm Dia Di K-7 Pipi Line Rising Main, 160mm Dia Pvc Gravity Pipeline 6 Kg/Cm2, Design and Construction of Rcc Sump and Pump House at Damnagar Hw With O&m for 2 Years Under Chorvadlaaugmantation Group Wss. Taluka: Palitana/Gariyadhar/Sihor/ Umrala. District Bhavnagar

Design Construction and O&m of 310 M3/Hr Capacity Water Treatment Plnat at Bhilwas Hw and 844 M3/Hr at Capacity Water Treatment Plnat, Providing, Supplying Lowering and Laying & Jointing 350mm, 400mm,450mm and 600mm Dia Di K-7 Pipi Line Rising Main, 160mm Dia Pvc Gravity Pipeline 6 Kg/Cm2, Design and Construction of Rcc Sump and Pump House at Damnagar Hw With O&m for 2 Years Under Chorvadlaaugmantation Group Wss. Taluka: Palitana/Gariyadhar/Sihor/ Umrala. District Bhavnagar is an approved pipeline project in Chorvadala, Sihor, Bhavnagar, Gujarat. The site covers 24.7 acres. Its stated project cost is ₹54.5 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 11 Mar 2024).

See it on the live map All projects in Bhavnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Design Construction and O&m of 310 M3/Hr Capacity Water Treatment Plnat at Bhilwas Hw and 844 M3/Hr at Capacity Water Treatment Plnat, Providing, Supplying Lowering and Laying & Jointing 350mm, 400mm,450mm and 600mm Dia Di K-7 Pipi Line Rising Main, 160mm Dia Pvc Gravity Pipeline 6 Kg/Cm2, Design and Construction of Rcc Sump and Pump House at Damnagar Hw With O&m for 2 Years Under Chorvadlaaugmantation Group Wss. Taluka: Palitana/Gariyadhar/Sihor/ Umrala. District Bhavnagar is an approved pipeline project in Chorvadala, Sihor, Bhavnagar, Gujarat. The site covers 24.7 acres.

Who is building it?

The applicant is Ee Radhanpur Gwssb.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 11 Mar 2024), as of 27 Nov 2026.

Where is it?

In Chorvadala, Sihor, Bhavnagar, Gujarat.

How big is it?

It has a stated cost of ₹54.5 crore; a site of 24.7 acres and 1.9 acres (0.8 ha) of forest land.

When was it filed?

The application was filed on 16 Jun 2023.

Project details

StatusForest land use approved
Status since11 Mar 2024
Application filed16 Jun 2023
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantEe Radhanpur Gwssb
Land area24.7 acres (10 ha)
Forest land1.9 acres (0.8 ha)
Project cost₹54.5 crore
Village / localityChorvadala
Taluk / tehsilSihor
DistrictBhavnagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-14187

In context

19 applications in Bhavnagar since January 2022 are in the same category (Pipelines): 10 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 24.7 acres, this one is larger than 88% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chorvadala, Sihor, Bhavnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ee Radhanpur Gwssb in Bhavnagar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.