Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Nov 2026 |
| Application filed | 15 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Clean Max Kratos Private Limited |
| Land area | 100 m² |
| Forest land | 2,250 m² |
| Project cost | ₹75 lakh |
| Village / locality | Devalia |
| Taluk / tehsil | Babra |
| District | Amreli |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14021 |
In context
18 applications in Amreli since January 2022 are in the same category (Power): 9 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Devalia, Babra, Amreli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 66 KV S/C Line from Mota Devaliya PSS to GETCO Mota Devaliya in RF Forest — lapsed, 800 m away
- 33 KV S/C Transmission Line from Mota Devaliya PSS to Solar Project(Situated… — forest land use approved, 950 m away
- Diversion of Reserved Forest land for the Total Forest Road length 2250 Mtr.… — under forest review, 4.2 km away
- 33 KV S/C Transmission line Crossing SH-31 (Babra-Vasavad) road — in-principle approval, conditions pending, 10.7 km away
- 66 KV Overhead Transmission line — more information requested, 15 km away
- 33 KV S/C Crossing SH-31 (Babra-Vasavad) road by Cleanmax Bhoomi PVT LTD. — lapsed, 15.9 km away
- Overhead 11 Kv Transmission Line at Vil:Chital Tal:Amreli Dist:Amreli — lapsed, 16.5 km away
- Harbhole Stone Quarry (Untvad Blacktrap Mine) — returned to applicant, 16.6 km away
More from Clean Max Kratos Private Limited in Amreli
- 33 KV S/C Transmission Line from Mota Devaliya PSS to Solar Project(Situated… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.