Quick answers
What is this project?
Diversion of 3.4020 Hectares of Reserved Forest Land for Construction of Various Public Utilities and Essential Infrastructure is a proposed building project in Anida (Kumbhan), Palitana, Bhavnagar, Gujarat. The site covers 10.1 acres.
Who is building it?
The applicant is Vankiya Hanuman Jini Jagya (Anida) (Kumbhan).
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Anida (Kumbhan), Palitana, Bhavnagar, Gujarat.
How big is it?
It has a stated cost of ₹1.4 crore; a site of 10.1 acres and 8.4 acres (3.4 ha) of forest land.
When was it filed?
The application was filed on 2 Nov 2026.
Project details
| Official title | Proposal for Diversion of 3.4020 Hectares of Reserved Forest Land for Construction of Various Public Utilities and Essential Infrastructure at Village Anida, Taluka Palitana, District Bhavnagar, in Favour of Vankiya Hanuman jini Jagya Trust. |
|---|---|
| Status | Initial checks |
| Status since | 2 Nov 2026 |
| Application filed | 2 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Vankiya Hanuman Jini Jagya (Anida) (Kumbhan) |
| Land area | 10.1 acres (4.1 ha) |
| Forest land | 8.4 acres (3.4 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Anida (Kumbhan) |
| Taluk / tehsil | Palitana |
| District | Bhavnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-15063 |
In context
9 applications in Bhavnagar since January 2022 are in the same category (Buildings & townships): 5 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Anida (Kumbhan), Palitana, Bhavnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Design Construction and O&m of 310 M3/Hr Capacity Water Treatment Plnat at… — forest land use approved, 5.9 km away
- Chorvadla Zone Augmantation — lapsed, 6.1 km away
- Ug Ofc Line in Bhavnagar Dist. — lapsed, 7.2 km away
- 4" Steel Gas pipeline for DRS Installation at Shihor Ta: Shihor Dist: Bhavnagar — forest land use approved, 11.9 km away
- Proposed Active Pharmaceutical Ingredient (API) manufacturing unit of M/s.… — environmental approval granted, 12.5 km away
- Proposed Active Pharmaceutical Ingredient (API) manufacturing unit of M/s.… — cleared for impact study, 12.5 km away
- Diversion of 0.5280 Ha. Road Side Protected Forest Land for Construction of… — forest land use approved, 12.7 km away
- Mining project by M/s. Adinath Stone — environmental approval granted, 13.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.