Quick answers
What is this project?
4'' Dia Steel Gas Pipeline to supply connectivity for Arbuda Petroleum, Ta.: Mansa Dist: Gandhinagar is an approved pipeline project in Mansa (M), Mansa, Gandhinagar, Gujarat. It seeks 0 acres of forest land.
Who is building it?
The applicant is Sabarmati Gas LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 21 Jun 2026), as of 27 Nov 2026.
Where is it?
In Mansa (M), Mansa, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹2 lakh and 20 m² of forest land.
When was it filed?
The application was filed on 5 Mar 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 21 Jun 2026 |
| Application filed | 5 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Sabarmati Gas LTD |
| Forest land | 20 m² |
| Project cost | ₹2 lakh |
| Village / locality | Mansa (M) |
| Taluk / tehsil | Mansa |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14449 |
In context
23 applications in Gandhinagar since January 2022 are in the same category (Pipelines): 8 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2.5 years from filing to approval.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mansa (M), Mansa, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 425 Bedded Hospital at Civil Hospital Complex, Mansa, Gujarat — lapsed, 2.9 km away
- 425 Bedded Hospital at Civil Hospital Complex, Mansa, Gujarat — withdrawn, 2.9 km away
- 4" Dia Steel Gas Pipeline Connectivity For Vjaraj Petroleum, Mansa , Dist:… — forest land use approved, 3.4 km away
- Industrial project by M/s. Modern Polymer Industries — environmental approval granted, 4 km away
- Industrial project by M/s. Modern Polymer Industries — cleared for impact study, 4 km away
- Industrial project by Rushil Decor Ltd. — environmental approval granted, 4 km away
- PROPOSED SYNTHETIC ORGANIC CHEMICAL (RESIN) MANUFACTURING UNIT WITHIN THE… — under environmental review, 4.2 km away
- Diversion of Protected Forest for widening of Balva Gozaria Road (SH-71) in… — more information requested, 4.8 km away
More from Sabarmati Gas LTD in Gandhinagar
- Laying of 4" Dia Steel Gas Pipeline For Arbuda Fuel Station — lapsed
- Laying of 4" Dia Steel Gas Pipeline for V and V Company CNG Connectivity at… — initial checks
- Dehgam to Bayad to Dhansura Steel Pipeline Connectivity — more information requested
- Shree Swaminarayan Petroleum CNG Station Connectivity at Ambod — lapsed
- Nana Chiloda to Mota Chiloda Pipeline Connectivity — forest land use approved
- Gandhinagar Steel Network Redundancy Plan Connectivity — lapsed
13 Sabarmati Gas projects in Gandhinagar
All 76 Sabarmati Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.