What is this project?
CRZ Clearance for Proposed SPM, Sub Sea Pipeline up to LFP, Onshore Pipeline and COT by HPCL is an approved industrial building project in Gundiyali, Mandvi, Kachchh, Gujarat. The site covers 749.7 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 21 Aug 2024), as of 27 Nov 2026.
Where is it?
In Gundiyali, Mandvi, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹1,624.9 crore and a site of 749.7 acres.
When was it filed?
The application was filed on 28 Nov 2023.
Project details
| Official title | CRZ Clearance for Proposed SPM, Sub Sea Pipeline up to LFP, Onshore Pipeline and COT at Tragadi Village, Tal: Mandvi, Dist.: Kutch, Gujarat. |
|---|---|
| Status | Coastal clearance granted |
| Status since | 21 Aug 2024 |
| Application filed | 28 Nov 2023 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Use | Industrial |
| Land area | 749.7 acres (303.4 ha) |
| Plot area | 26,95,302 m² (2,90,11,961 sq ft) |
| Project cost | ₹1,624.9 crore |
| Village / locality | Gundiyali |
| Taluk / tehsil | Mandvi |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14771 |
In context
76 applications in Kachchh since January 2022 are in the same category (Buildings & townships): 25 approved, 36 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 749.7 acres, this one is larger than 90% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gundiyali, Mandvi, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Bhukera Alimamad Rahemtulla Re-appraisal Area-4.00.00Survey no.- 553… — not approved, 3.9 km away
- Sea Water Intake of 350 MLD, Desalination Plant & Laying of 320 MLD Deep Sea… — coastal clearance granted, 5.8 km away
- Mundra Thermal Power Station — lapsed, 6.5 km away
- Environmental & CRZ Clearance for Electronic Manufacturing Cluster (EMC) — returned to applicant, 6.6 km away
- Residential Colony for Solar Manufacturing Business Plant/ Units at area… — initial checks, 8 km away
- Transfer of EC/Change in Name subsequent to NCLT Order from Adani Cementation… — lapsed, 8.1 km away
- "Workmen Accommodation – Plot A" Building Construction Project (Residential)… — environmental approval granted, 8.7 km away
- "Workmen Accommodation – Plot A" Building Construction Project (Residential)… — withdrawn, 8.7 km away
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.