Quick answers
What is this project?
New Rest House Building at Suvali Beach, Beside Reliance Training Institute, Ta. Choryasi, Dist. Surat, Gujarat is a lapsed building project in Abhva, Majura, Surat, Gujarat. The site covers 1.2 acres.
Who is building it?
The applicant is R&B Surat Division-1.
Has it been approved?
No. The application was lapsed on 21 May 2026, so it is no longer under consideration.
Where is it?
In Abhva, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹2.2 crore and a site of 1.2 acres.
When was it filed?
The application was filed on 28 Mar 2026.
Project details
| Official title | Construction of New Rest House Building at Suvali Beach, Beside Reliance Training Institute, Ta. Choryasi, Dist. Surat, Gujarat. |
|---|---|
| Status | Lapsed |
| Status since | 21 May 2026 |
| Application filed | 28 Mar 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | R&B Surat Division-1 |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹2.2 crore |
| Village / locality | Abhva |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14796 |
In context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 72% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Abhva, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Deep Draft Green Field Captive Port — cleared for impact study, 1.6 km away
- Proposed Expansion of Heavy Engineering Equipments Manufacturing Plant at A.… — lapsed, 3.1 km away
- Transfer of Environmental Clearance granted to Sanghi Industries Limited for… — under environmental review, 3.3 km away
- Deep Draft Green Field Captive Port — environmental approval granted, 3.7 km away
- Diversion of 38.8633 Ha of forest land — lapsed, 3.8 km away
- ArcelorMittal Nippon Steel 15.6 / 21 MTPA Steel Expansion Complex — under forest review, 3.9 km away
- Partial Change of Land-Use of 25.00 Ha. Unclassed Forest Land permitted for… — under forest review, 3.9 km away
- Diversion of 2.087 Ha Reserved Forest Land for Hazira Port Railway… — initial checks, 3.9 km away