Quick answers
What is Deep Draft Green Field Captive Port?
Deep Draft Green Field Captive Port is a proposed building project in Sunvali, Chorasi, Surat, Gujarat. The site covers 1,472.2 acres.
Who is building it?
The applicant is M/S. Amns India Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 13 Oct 2022), as of 27 Nov 2026.
Where is it?
In Sunvali, Chorasi, Surat, Gujarat.
How big is it?
It has a stated cost of ₹114.8 crore and a site of 1,472.2 acres.
When was it filed?
The application was filed on 13 Oct 2022.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Deep Draft Green Field Captive Port
Project details
| Official title | Development of Deep Draft Green Field Captive Port at Suvali Village, Surat District, Gujarat by ArcelorMittal Nippon Steel India Limited, Hazira, Surat, Gujarat |
|---|---|
| Status | Cleared for impact study |
| Status since | 13 Oct 2022 |
| Application filed | 13 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | M/S. Amns India Limited |
| Land area | 1,472.2 acres (595.8 ha) |
| Project cost | ₹114.8 crore |
| Village / locality | Sunvali |
| Taluk / tehsil | Chorasi |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00199 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Aug 2026 | Lapsed | 1,875.9 acres | ₹114.8 crore |
| New project filed 11 Aug 2026 | Environmental approval granted | 2,772 acres | ₹114.8 crore |
| Early planning filed 13 Oct 2022 (this page) | Cleared for impact study | 1,472.2 acres | ₹114.8 crore |
In context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1,472.2 acres, this one is larger than 100% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sunvali, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Rest House Building at Suvali Beach, Beside Reliance Training Institute,… — lapsed, 1.6 km away
- Deep Draft Green Field Captive Port — environmental approval granted, 2.2 km away
- Diversion of 2.087 Ha Reserved Forest Land for Hazira Port Railway… — initial checks, 2.5 km away
- Proposed Expansion of Heavy Engineering Equipments Manufacturing Plant at A.… — lapsed, 2.8 km away
- ArcelorMittal Nippon Steel 15.6 / 21 MTPA Steel Expansion Complex — under forest review, 2.8 km away
- Partial Change of Land-Use of 25.00 Ha. Unclassed Forest Land permitted for… — under forest review, 2.9 km away
- Partial Change of Land-Use of 7.34 Ha. out of total 25.00 Ha. Unclassed Forest… — under forest review, 3 km away
- Diversion of 38.8633 Ha of forest land — lapsed, 3 km away
All 3 Amns India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.