Crz Clearance for Laying of 3 Parallel Above Ground Pipeline That Is 12" & 20" Petroleum Product Pipelines & 4" Air/Nitrogen Pipeline by HPCL is an approved port and coastal project in Aadipur, Gandhidham, Kachchh, Gujarat. The site covers 4.8 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 17 Jan 2024), as of 27 Nov 2026.
Where is it?
In Aadipur, Gandhidham, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹158.4 crore and a site of 4.8 acres.
When was it filed?
The application was filed on 8 Nov 2023.
Project details
| Official title | Crz Clearance for Laying of 3 Parallel Above Ground Pipeline That Is 12" & 20" Petroleum Product Pipelines & 4" Air/Nitrogen Pipeline With Associated Facilities From Kandla Terminal Located at Khari Rohar, Kandla, Gandhidham to Kandla Port Trust, Oil Jetty 4 Covering Each Pipeline Having Approx. Length 8.3km |
|---|---|
| Status | Coastal clearance granted |
| Status since | 17 Jan 2024 |
| Application filed | 8 Nov 2023 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 4.8 acres (2 ha) |
| Project cost | ₹158.4 crore |
| Village / locality | Aadipur |
| Taluk / tehsil | Gandhidham |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14908 |
In context
36 applications in Kachchh since January 2022 are in the same category (Ports & coast): 13 approved, 16 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.8 acres, this one is smaller than 97% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aadipur, Gandhidham, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- IVFRT Work Gandhidham -Kandla Port — more information requested, 1.2 km away
- CRZ Clearance for laying 2 Nos. x 24" NB Propane/ Butane/ LPG Pipeline from… — coastal clearance granted, 1.7 km away
- Expansion of Port by Creation of Water Front Facilities (Oil Jetties 8,9,10 &… — more information requested, 2 km away
- Laying of 24" inch New HSD pipeline from Oil Jetty-06 to IFFCO chamber in… — coastal clearance granted, 3.3 km away
- No Increase in Pollution Load for Proposed Change in Product Mix for… — initial checks, 3.5 km away
- Modernization of Existing Fertilizer Plant for Manufacturing of Nano Npk… — environmental approval granted, 3.5 km away
- Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer… — environmental approval granted, 3.5 km away
- Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer… — cleared for impact study, 3.5 km away
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.