What is IVFRT Work Gandhidham -Kandla Port?
IVFRT Work Gandhidham -Kandla Port is a proposed telecom project in Kidana, Gandhidham, Kachchh, Gujarat. The site covers 1.3 acres.
Who is building it?
The applicant is Railtel Corporation of India Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kidana, Gandhidham, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹99 lakh; a site of 1.3 acres and 1.3 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 6 Oct 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 6 Jan 2025 |
| Application filed | 6 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Railtel Corporation of India Limited |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 1.3 acres (0.5 ha) |
| Project cost | ₹99 lakh |
| Village / locality | Kidana |
| Taluk / tehsil | Gandhidham |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13199 |
In context
46 applications in Kachchh since January 2022 are in the same category (Telecom): 11 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 1.3 acres, this one is larger than 61% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kidana, Gandhidham, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Crz Clearance for Laying of 3 Parallel Above Ground Pipeline That Is 12" & 20"… — coastal clearance granted, 1.2 km away
- CRZ Clearance for laying 2 Nos. x 24" NB Propane/ Butane/ LPG Pipeline from… — coastal clearance granted, 1.9 km away
- Expansion of Port by Creation of Water Front Facilities (Oil Jetties 8,9,10 &… — more information requested, 3.2 km away
- Laying of 24" inch New HSD pipeline from Oil Jetty-06 to IFFCO chamber in… — coastal clearance granted, 4.1 km away
- No Increase in Pollution Load for Proposed Change in Product Mix for… — initial checks, 4.2 km away
- Modernization of Existing Fertilizer Plant for Manufacturing of Nano Npk… — environmental approval granted, 4.2 km away
- Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer… — environmental approval granted, 4.2 km away
- Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer… — cleared for impact study, 4.2 km away
More from Railtel Corporation of India Limited in Kachchh
- Diversion of 0.2182 Ha Proposed Roadside Protected Forest land of Mundra to… — more information requested
- Diversion of Proposed Roadside Protected Forest land of Gandhidham Mundra… — forest land use approved
3 Railtel Corporation of India projects in Kachchh
All 7 Railtel Corporation of India projects across India