Quick answers
What is this project?
Up-Gradation of Fish Landing Centre at Navibandar, District Porbandar, Gujarat is an approved project in Navi Bandar, Porbandar, Gujarat.
Who is building it?
The applicant is Department of Fisheries,Government of Gujarat.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 11 Jul 2024), as of 27 Nov 2026.
Where is it?
In Navi Bandar, Porbandar, Gujarat.
When was it filed?
The application was filed on 28 Feb 2024.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 11 Jul 2024 |
| Application filed | 28 Feb 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Other |
| Applicant | Department of Fisheries,Government of Gujarat |
| Village / locality | Navi Bandar |
| Taluk / tehsil | Porbandar |
| District | Porbandar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14949 |
In context
20 applications in Porbandar since January 2022 are in the same category (Other): 8 approved, 3 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Navi Bandar, Porbandar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The proposed pipeline for Deep Sea Disposal from the Sump — coastal clearance granted, 2.8 km away
- Jetpur Project- Survey, Investigation, Design, Engineering, Procurement of… — lapsed, 3.3 km away
- Jetpur Project- Survey, Investigation, Design, Engineering, Procurement of… — lapsed, 3.3 km away
- Aksha Fish Meal and Oil — coastal clearance granted, 9.1 km away
- Balej Building Limestone Block B5 Mining Project, Survey No. 52/4/1 P & New… — lapsed, 12.7 km away
- Rajshi Devdas Kadchha — returned to applicant, 12.8 km away
- Balej Building Limestone Block B6 mining Project, Survey No. 52/4/1P & New… — lapsed, 13 km away
- Mulubhai Karashanbhai Timba — environmental approval granted, 13.4 km away
All 27 Department of Fisheries,Government of Gujarat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.