Quick answers
What is this project?
Offshore Oil and Gas Development and Production in CB/OSDSF/AMBE/2021 (728.19 sq. km) block, located in Gulf of Khambhat, Dist. - Surat, Gujarat is a proposed pipeline project in Na, Olpad, Surat, Gujarat.
Who is building it?
The applicant is M/s Vedanta Limited(Division Cairn Oil & Gas).
Has it been approved?
Not yet. The application is still under review: its status is “Application filed”, as of 27 Nov 2026.
Where is it?
In Na, Olpad, Surat, Gujarat.
How big is it?
It has a stated cost of ₹1,912 crore.
One of 5 filings for this project. The project's main page, with every filing and where each stands: Offshore Oil and Gas Development and Production in CB/OSDSF/AMBE/2021 (728.19 sq. km)…
Project details
| Status | Application filed |
|---|---|
| Status since | 11 Nov 2026 |
| Approval sought | Coastal review |
| Application type | Ownership transfer |
| Sector | Pipelines |
| Applicant | M/s Vedanta Limited(Division Cairn Oil & Gas) |
| Project cost | ₹1,912 crore |
| Village / locality | Na |
| Taluk / tehsil | Olpad |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-15128 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 10 Nov 2026 | Under environmental review | ₹1,912 crore | |
| New project filed 8 Aug 2025 | Environmental approval granted | ₹1,912 crore | |
| New project filed 11 Feb 2025 | Lapsed | ₹1,912 crore | |
| Early planning filed 30 Oct 2023 | Cleared for impact study | ₹1,912 crore | |
| Ownership transfer (this page) | Application filed | ₹1,912 crore |
In context
36 applications in Surat since January 2022 are in the same category (Pipelines): 16 approved, 8 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval.
Where it is
Na, Olpad, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Offshore Oil and Gas Development and Production in CB/OSDSF/AMBE/2021 (728.19… — under environmental review, 0 m away
- Offshore Oil and Gas Development and Production in CB/OSDSF/AMBE/2021 (728.19… — environmental approval granted, 0 m away
- Offshore Oil and Gas Development and Production in CB/OSDSF/AMBE/2021 (728.19… — lapsed, 0 m away
- Offshore Oil and Gas Development and Production in CB/OSDSF/AMBE/2021 (728.19… — cleared for impact study, 0 m away
- Expansion of Offshore Oil and Gas Development and Production in CB/OS-2 block… — lapsed, 19.6 km away
- Expansion of Offshore Oil and Gas Development and Production in CB/OS-2 block… — cleared for impact study, 19.6 km away
- Deep Draft Green Field Captive Port — cleared for impact study, 27 km away
- New Rest House Building at Suvali Beach, Beside Reliance Training Institute,… — lapsed, 27.1 km away
More from M/s Vedanta Limited(Division Cairn Oil & Gas) in Surat
- Expansion of Offshore Oil and Gas Development and Production in CB/OS-2 block… — lapsed
- Expansion of Offshore Oil and Gas Development and Production in CB/OS-2 block… — cleared for impact study
7 Vedanta Limited(Division Cairn projects in Surat
All 76 Vedanta Limited(Division Cairn projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.