Quick answers
What is Industrial project by M/s Greenlam Industries Limited?
This proposed industrial project by M/s Greenlam Industries Limited is in Kanwan Wali (25), 0, Solan, Himachal Pradesh. The site covers 16.6 acres.
Who is building it?
The applicant is Greenlam Industries Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Nov 2022), as of 27 Nov 2026.
Where is it?
In Kanwan Wali (25), 0, Solan, Himachal Pradesh.
How big is it?
It has a stated cost of ₹204.7 crore and a site of 16.6 acres.
When was it filed?
The application was filed on 22 Nov 2022.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 Nov 2022 |
| Application filed | 22 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Greenlam Industries Limited |
| Land area | 16.6 acres (6.7 ha) |
| Project cost | ₹204.7 crore |
| Village / locality | Kanwan Wali (25) |
| Taluk / tehsil | 0 |
| District | Solan |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00006 |
In context
12 applications in Solan since January 2022 are in the same category (Industry): 7 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected. At 16.6 acres, this one is larger than 67% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanwan Wali (25), 0, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of Sand, Stone, and Bajri from Riverbed Proposed by Sh. Sunil Garg… — lapsed, 1.6 km away
- Transfer of Environment Clearance from letter no. HPSEIAA/2024/1197… — environmental approval granted, 2 km away
- Mining of Sand, Stone & Bajri from Palli Mahadev Khad proposed by Sh. Sunil… — environmental approval granted, 2 km away
- Sand, Stone & Bajri Mining Project, Khasra No. 252/1, 253/1,… — under environmental review, 3.2 km away
- Diversion of 24.9 ha forest land for the setting up of Solar Power Project(13… — lapsed, 4.2 km away
- Link Road to Village Khobla — lapsed, 4.2 km away
- Terrace Deposits Mining for extraction of Sand, Stone and Bajri proposed by… — environmental approval granted, 4.7 km away
- Riverbed Mining for Extraction of Sand, Stone and Bajri from Kundlu Khad… — environmental approval granted, 5.1 km away
All 3 Greenlam Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.