Quick answers
What is this project?
Mining of Sand, Stone, and Bajri from Riverbed Proposed by Sh. Sunil Garg Prop. M/s Aggarwal Stone Crusher is a lapsed mining project in Aduwal Jandori (66), Nalagarh, Solan, Himachal Pradesh. The site covers 136.6 acres.
Who is building it?
The applicant is Sunil Kumar.
Has it been approved?
No. The application was lapsed on 14 Feb 2025, so it is no longer under consideration.
Where is it?
In Aduwal Jandori (66), Nalagarh, Solan, Himachal Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 136.6 acres.
When was it filed?
The application was filed on 14 Feb 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Feb 2025 |
| Application filed | 14 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Sunil Kumar |
| Land area | 136.6 acres (55.3 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Aduwal Jandori (66) |
| Taluk / tehsil | Nalagarh |
| District | Solan |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00385 |
In context
70 applications in Solan since January 2022 are in the same category (Mining): 54 approved, 7 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 136.6 acres, this one is larger than 97% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Aduwal Jandori (66), Nalagarh, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environment Clearance from letter no. HPSEIAA/2024/1197… — environmental approval granted, 700 m away
- Mining of Sand, Stone & Bajri from Palli Mahadev Khad proposed by Sh. Sunil… — environmental approval granted, 700 m away
- Industrial project by M/s Greenlam Industries Limited — cleared for impact study, 1.6 km away
- Link Road to Village Khobla — lapsed, 2.7 km away
- Sand, Stone & Bajri Mining Project, Khasra No. 252/1, 253/1,… — under environmental review, 3.8 km away
- Diversion of 24.9 ha forest land for the setting up of Solar Power Project(13… — lapsed, 4.1 km away
- Riverbed Mining for Extraction of Sand, Stone and Bajri from Kundlu Khad… — environmental approval granted, 5.1 km away
- Terrace Deposits Mining for extraction of Sand, Stone and Bajri proposed by… — environmental approval granted, 6 km away
More from Sunil Kumar in Solan
- Mining of Sand, Stone & Bajri from Palli Mahadev Khad proposed by Sh. Sunil… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.