Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Oct 2025 |
| Application filed | 28 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | K N Cements Limited |
| Land area | 60.8 acres (24.6 ha) |
| Project cost | ₹16 lakh |
| Village / locality | Dhab Pipli (215) |
| Taluk / tehsil | Kamrau |
| District | Sirmaur |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00170 |
In context
97 applications in Sirmaur since January 2022 are in the same category (Mining): 49 approved, 18 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 60.8 acres, this one is larger than 95% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 84.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Dhab Pipli (215), Kamrau, Sirmaur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for the extension of EC validity proposal for Extraction of Lime… — environmental approval granted, 400 m away
- Application for Extension of Ec Validity Proposal for the Extraction of Lime… — environmental approval granted, 950 m away
- Application for extension of EC validity proposal for Extraction of Lime Stone… — environmental approval granted, 1 km away
- Extension of EC validity proposal for the extraction of Lime Stone from Khasra… — environmental approval granted, 1.2 km away
- Hill Slope Mining for Extraction of Lime Stone Proposed by Sh. Yashwardhan… — environmental approval granted, 3.1 km away
- Hill Slope Mining for Extraction of Lime Stone Proposed by Sh. Yashwardhan… — not approved, 3.1 km away
- Chowki Mrigwal" Lime Stone Mine, Proposed Limestone Production Expansion from… — lapsed, 6.4 km away
- Construction of Link Road From NH-707 to Village Kunth Km 0/00 to 5/00 — lapsed, 7.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.