Project details
| Official title | Application for extension of EC validity proposal for Extraction of Lime Stone by Sh. Deepak Bhatnagar Prop. M/s Janki Mines & Minerals, located at Mauza Kamroo of Tehsil Poanta Shaib, District Sirmour, H.P over an area of 66-04 bighas (5.61 Hectares), |
|---|---|
| Status | Environmental approval granted |
| Status since | 17 Jul 2026 |
| Application filed | 30 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Janki Mines & Minerals |
| Land area | 13.9 acres (5.6 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Ashyari (220) |
| Taluk / tehsil | Shalai |
| District | Sirmaur |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00332 |
In context
97 applications in Sirmaur since January 2022 are in the same category (Mining): 49 approved, 18 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 13.9 acres, this one is larger than 78% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 34.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Ashyari (220), Shalai, Sirmaur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for Extension of Ec Validity Proposal for the Extraction of Lime… — environmental approval granted, 400 m away
- Application for the extension of EC validity proposal for Extraction of Lime… — environmental approval granted, 650 m away
- Extension of EC validity proposal for the extraction of Lime Stone from Khasra… — environmental approval granted, 750 m away
- EC Validity Extension of Bhimgoda Limestone Mine Mining Project at Khasra… — environmental approval granted, 1 km away
- Hill Slope Mining for Extraction of Lime Stone Proposed by Sh. Yashwardhan… — environmental approval granted, 2.5 km away
- Hill Slope Mining for Extraction of Lime Stone Proposed by Sh. Yashwardhan… — not approved, 2.5 km away
- Chowki Mrigwal" Lime Stone Mine, Proposed Limestone Production Expansion from… — lapsed, 5.5 km away
- Construction of Link Road From NH-707 to Village Kunth Km 0/00 to 5/00 — lapsed, 7.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.