What is Developing? Open the mapMap

Cleared for impact studyMining · Kangra, Himachal Pradesh

Extraction of Sand, Stone and Bajri from Khasra no. 723/1 over an area measuring 02-89-62 Ha (Pvt. Land- River bed of Chakki Khad) falling in Mohal Maira Batrah, Mauza Maira Doomal, Tehsil Nurpur, District Kangra, Himachal Pradesh by Sh. Dharambir Singh, Partner M/s New Shiva Stone Crusher.

Extraction of Sand, Stone and Bajri from Khasra no. 723/1 over an area measuring 02-89-62 Ha (Pvt. Land- River bed of Chakki Khad) falling in Mohal Maira Batrah, Mauza Maira Doomal, Tehsil Nurpur, District Kangra, Himachal Pradesh by Sh. Dharambir Singh, Partner M/s New Shiva Stone Crusher is a proposed mining project in Uprer (75), Nurpur, Kangra, Himachal Pradesh. The site covers 7.2 acres. Its stated project cost is ₹25 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 Apr 2025).

See it on the live map All projects in Kangra

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Extraction of Sand, Stone and Bajri from Khasra no. 723/1 over an area measuring 02-89-62 Ha (Pvt. Land- River bed of Chakki Khad) falling in Mohal Maira Batrah, Mauza Maira Doomal, Tehsil Nurpur, District Kangra, Himachal Pradesh by Sh. Dharambir Singh, Partner M/s New Shiva Stone Crusher is a proposed mining project in Uprer (75), Nurpur, Kangra, Himachal Pradesh. The site covers 7.2 acres.

Who is building it?

The applicant is Dharmvir Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 28 Apr 2025), as of 27 Nov 2026.

Where is it?

In Uprer (75), Nurpur, Kangra, Himachal Pradesh.

How big is it?

It has a stated cost of ₹25 lakh and a site of 7.2 acres.

When was it filed?

The application was filed on 3 Feb 2025.

Project details

StatusCleared for impact study
Status since28 Apr 2025
Application filed3 Feb 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantDharmvir Singh
Land area7.2 acres (2.9 ha)
Project cost₹25 lakh
Village / localityUprer (75)
Taluk / tehsilNurpur
DistrictKangra
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-00438

In context

131 applications in Kangra since January 2022 are in the same category (Mining): 91 approved, 25 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.2 acres, this one is smaller than 68% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 68.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.

Where it is

Uprer (75), Nurpur, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Dharmvir Singh in Kangra

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.