What is Developing? Open the mapMap

Cleared for impact studyIndustry · Sonipat, Haryana

Proposed Greenfield Project of "Formaldehyde Manufacturing Unit of 120 TPD (40,200 TPA) Capacity"

Proposed Greenfield Project of "Formaldehyde Manufacturing Unit of 120 TPD (40,200 TPA) Capacity" is a proposed industrial project in Mirakpur, Sonipat, Haryana. The site covers 0.9 acres. Its stated project cost is ₹9.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Dec 2024).

See it on the live map All projects in Sonipat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Greenfield Project of "Formaldehyde Manufacturing Unit of 120 TPD (40,200 TPA) Capacity" is a proposed industrial project in Mirakpur, Sonipat, Haryana. The site covers 0.9 acres.

Who is building it?

The applicant is Ancon Chemplast Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 13 Dec 2024), as of 27 Nov 2026.

Where is it?

In Mirakpur, Sonipat, Haryana.

How big is it?

It has a stated cost of ₹9.9 crore and a site of 0.9 acres.

When was it filed?

The application was filed on 28 Nov 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Greenfield Project of "Formaldehyde Manufacturing Unit of 120 TPD (40,200 TPA)…

Project details

StatusCleared for impact study
Status since13 Dec 2024
Application filed28 Nov 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAncon Chemplast Private Limited
Land area3,600 m²
Project cost₹9.9 crore
Village / localityMirakpur
Taluk / tehsilSonipat
DistrictSonipat
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-00492

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 17 Sept 2025Environmental approval granted0.9 acres₹9.9 crore
Early planning filed 28 Nov 2024 (this page)Cleared for impact study0.9 acres₹9.9 crore

In context

50 applications in Sonipat since January 2022 are in the same category (Industry): 14 approved, 7 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 88% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mirakpur, Sonipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ancon Chemplast Private Limited in Sonipat

All 3 Ancon Chemplast projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.