Quick answers
What is this project?
Proposed Greenfield Project of "Formaldehyde Manufacturing Unit of 120 TPD (40,200 TPA) Capacity" is an approved industrial project in Mirakpur, Sonipat, Haryana. The site covers 0.9 acres.
Who is building it?
The applicant is Ancon Chemplast Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Oct 2025), as of 27 Nov 2026.
Where is it?
In Mirakpur, Sonipat, Haryana.
How big is it?
It has a stated cost of ₹9.9 crore and a site of 0.9 acres.
When was it filed?
The application was filed on 17 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Oct 2025 |
| Application filed | 17 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Ancon Chemplast Private Limited |
| Land area | 3,600 m² |
| Project cost | ₹9.9 crore |
| Village / locality | Mirakpur |
| Taluk / tehsil | Sonipat |
| District | Sonipat |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00895 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Sept 2025 (this page) | Environmental approval granted | 0.9 acres | ₹9.9 crore |
| Early planning filed 28 Nov 2024 | Cleared for impact study | 0.9 acres | ₹9.9 crore |
In context
50 applications in Sonipat since January 2022 are in the same category (Industry): 14 approved, 7 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 88% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mirakpur, Sonipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Greenfield Project of "Formaldehyde Manufacturing Unit of 120 TPD… — cleared for impact study, 0 m away
- Proposed Formaldehyde manufacturing Plant having capacity 40,200 TPA or 120… — cleared for impact study, 200 m away
- Diversion of forest land for proposed site for setting up Industrial Unit… — forest land use approved, 5.1 km away
- Diversion of forest land for proposed site for setting up Industrial Unit… — lapsed, 5.1 km away
- Diversion of forest land for approach access to proposed site for setting up… — lapsed, 5.4 km away
- Agro Based Warehouse by M/S Bhupender Jain & Sons Huf — lapsed, 5.5 km away
- Diversion of Forest land for access to Warehouse belonging to M/s Bhupender… — lapsed, 5.5 km away
- Diversion of Forest land for access to Industrial Unit Belonging to Sh. Luv… — lapsed, 5.7 km away
More from Ancon Chemplast Private Limited in Sonipat
- Proposed Formaldehyde manufacturing Plant having capacity 40,200 TPA or 120… — cleared for impact study
All 3 Ancon Chemplast projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.