Quick answers
What is this project?
Proposed expansion of existing Industrial Unit by M/s Knorr Bremse India Private Limited is an approved industrial building project in Baghaula, Palwal, Haryana. It plans buildings of up to 3 floors on 17.9 acres.
Who is building it?
The applicant is Knorr Bremse India Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 31 Jan 2025), as of 27 Nov 2026.
Where is it?
In Baghaula, Palwal, Haryana.
How big is it?
It has a stated cost of ₹917.6 crore and a site of 17.9 acres.
When was it filed?
The application was filed on 23 Sept 2024.
Project details
| Official title | Proposed expansion of existing Industrial Unit in the revenue estate of Village-Baghola, Tehsil and District Palwal, Haryana being developed by M/s Knorr Bremse India Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 31 Jan 2025 |
| Application filed | 23 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Knorr Bremse India Private Limited |
| Use | Industrial |
| Floors (tallest) | 3 |
| Parking spaces | 184 |
| Land area | 17.9 acres (7.3 ha) |
| Built-up area | 55,992 m² (6,02,692 sq ft) |
| Plot area | 88,269 m² (9,50,119 sq ft) |
| Project cost | ₹917.6 crore |
| Village / locality | Baghaula |
| Taluk / tehsil | Palwal |
| District | Palwal |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00587 |
In context
30 applications in Palwal since January 2022 are in the same category (Buildings & townships): 9 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 17.9 acres, this one is larger than 80% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baghaula, Palwal, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.2038 Ha. of Forest Land for laying of PNG Pipeline on Village -… — lapsed, 1.5 km away
- ENVIRONMENTAL CLEARANCE FOR SETTING UP OF INDUSTRIAL UNIT (FERROUS AND NON-… — under environmental review, 2.1 km away
- Proposed Integrated Manufacturing facility of Auto Components. — under environmental review, 2.7 km away
- Proposed Cement Grinding Unit with Cement Production Capacity of 2 x 3 Million… — environmental approval granted, 3.2 km away
- Proposed Cement Grinding Unit with Cement Production Capacity of 2 x 3 Million… — cleared for impact study, 3.2 km away
- Jyoti Strips Private Limited "Proposed Cold Rolling Mill Complex with… — under environmental review, 3.3 km away
- Jyoti Strips Private Limited "Proposed Cold Rolling Mill Complex with… — environmental approval granted, 3.3 km away
- Jyoti Strips Private Limited "Proposed Cold Rolling Mill Complex with… — cleared for impact study, 3.3 km away
All 3 Knorr Bremse projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.