Quick answers
What is this project?
Diversion of 0.2038 Ha. of Forest Land for laying of PNG Pipeline on Village - Baghola to Village – Devli on Baghola-Devli Road and Village - Baghola to Avon Tubetech Industry on Baghola - Janauli Road from Mathura Road is a lapsed pipeline project in Baghaula, Palwal, Haryana. The site covers 0.5 acres.
Who is building it?
The applicant is Adani Gas Limited.
Has it been approved?
No. The application was lapsed on 21 Jun 2025, so it is no longer under consideration.
Where is it?
In Baghaula, Palwal, Haryana.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.5 acres and 2,040 m² of forest land.
When was it filed?
The application was filed on 23 Jan 2023.
Project details
| Official title | Diversion of 0.2038 Ha. of Forest Land for laying of PNG Pipeline on Village - Baghola to Village – Devli on Baghola-Devli Road and Village - Baghola to Avon Tubetech Industry on Baghola - Janauli Road from Mathura Road in District Palwal (HR). |
|---|---|
| Status | Lapsed |
| Status since | 21 Jun 2025 |
| Application filed | 23 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Adani Gas Limited |
| Land area | 2,000 m² |
| Forest land | 2,040 m² |
| Project cost | ₹50 lakh |
| Village / locality | Baghaula |
| Taluk / tehsil | Palwal |
| District | Palwal |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-02044 |
In context
6 applications in Palwal since January 2022 are in the same category (Pipelines): 0 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baghaula, Palwal, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- ENVIRONMENTAL CLEARANCE FOR SETTING UP OF INDUSTRIAL UNIT (FERROUS AND NON-… — under environmental review, 1.2 km away
- Proposed Integrated Manufacturing facility of Auto Components. — under environmental review, 1.4 km away
- Proposed expansion of existing Industrial Unit by M/s Knorr Bremse India… — environmental approval granted, 1.5 km away
- Proposed Cement Grinding Unit with Cement Production Capacity of 2 x 3 Million… — environmental approval granted, 1.7 km away
- Proposed Cement Grinding Unit with Cement Production Capacity of 2 x 3 Million… — cleared for impact study, 1.7 km away
- Jyoti Strips Private Limited "Proposed Cold Rolling Mill Complex with… — under environmental review, 1.9 km away
- Jyoti Strips Private Limited "Proposed Cold Rolling Mill Complex with… — environmental approval granted, 1.9 km away
- Jyoti Strips Private Limited "Proposed Cold Rolling Mill Complex with… — cleared for impact study, 1.9 km away
All 23 Adani Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.