Quick answers
What is this project?
Expansion of industrial shed by increasing built-up area from 19,975 sqm to 36,470 sqm is an approved industrial building project in Manak Tabra, Panchkula, Haryana. It plans buildings of up to 3 floors on 18.3 acres.
Who is building it?
The applicant is Stylam Industries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 31 Dec 2025), as of 27 Nov 2026.
Where is it?
In Manak Tabra, Panchkula, Haryana.
How big is it?
It has a stated cost of ₹161 crore and a site of 18.3 acres.
When was it filed?
The application was filed on 2 Sept 2025.
Project details
| Official title | Expansion of industrial shed by increasing built-up area from 19,975 sqm to 36,470 sqm at Village Manak Tabra, Tehsil Raipur Rani, District Panchkula (Haryana) by Stylam Industries Limited. |
|---|---|
| Status | Environmental approval granted |
| Status since | 31 Dec 2025 |
| Application filed | 2 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Stylam Industries Limited |
| Use | Industrial |
| Floors (tallest) | 3 |
| Height | 23 m |
| Land area | 18.3 acres (7.4 ha) |
| Built-up area | 19,975 m² (2,15,009 sq ft) |
| Plot area | 74,089 m² (7,97,487 sq ft) |
| Project cost | ₹161 crore |
| Village / locality | Manak Tabra |
| Taluk / tehsil | Panchkula |
| District | Panchkula |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00832 |
In context
64 applications in Panchkula since January 2022 are in the same category (Buildings & townships): 18 approved, 10 filed or under review, and 36 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 18.3 acres, this one is larger than 78% of them.
41 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Manak Tabra, Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of forest land for access to approach road from the Proposed Site of… — forest land use approved, 150 m away
- Diversion of forest Land for approach access to Proposed Site for Setting Up… — forest land use approved, 250 m away
- Diversion of Forest Land for approach access to Proposed Site for setting up… — forest land use approved, 1.3 km away
- Diversion of Forest Land for access to approach road from the proposed site of… — forest land use approved, 1.4 km away
- Kirti Screening Plan — lapsed, 1.7 km away
- Diversion of Forest Land for Proposed Site of Kirti Screening Plant on Raipur… — lapsed, 1.8 km away
- Proposed RBM mining project "Raipur Rani-Manak Tabra Mining Unit" by M/s… — under environmental review, 2 km away
- Proposed RBM mining project "Raipur Rani-Manak Tabra Mining Unit" by M/s… — cleared for impact study, 2 km away
More from Stylam Industries Limited in Panchkula
- Diversion of forest land for access to approach road from the Proposed Site of… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.