Quick answers
What is this project?
CNG STATION OF M/s ADANI TOTAL GAS LIMITED ON MDR-132 (HODAL TO NUH ROAD), AT KM. 15.045 (LHS) is a proposed building project in Mithaka, Hathin, Palwal, Haryana. The site covers 1.1 acres.
Who is building it?
The applicant is Adani Total Gas Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Mithaka, Hathin, Palwal, Haryana.
How big is it?
It has a stated cost of ₹80 lakh; a site of 1.1 acres and 310 m² of forest land.
When was it filed?
The application was filed on 27 Sept 2026.
Project details
| Official title | CNG STATION OF M/s ADANI TOTAL GAS LIMITED ON MDR-132 (HODAL TO NUH ROAD), AT KM. 15.045 (LHS), IN VILLAGE KOT, TEHSIL HATHIN, DISTRICT- PALWAL IN THE STATE OF HARYANA |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 23 Nov 2026 |
| Application filed | 27 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Adani Total Gas Limited |
| Land area | 1.1 acres (0.5 ha) |
| Forest land | 310 m² |
| Project cost | ₹80 lakh |
| Village / locality | Mithaka |
| Taluk / tehsil | Hathin |
| District | Palwal |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-02315 |
In context
30 applications in Palwal since January 2022 are in the same category (Buildings & townships): 9 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 93% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mithaka, Hathin, Palwal, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Establish of CNG station on Hodal Nuh road, LHS, MDR 132, Kheat no 756/2,… — forest land use approved, 2 km away
- Diversion of forest land for access to the Hodel-Nuh Road (MDR-132) near Km… — forest land use approved, 4.6 km away
- Laying of Drinking Water Pipe Line From Rennywal Chandhut Near Yamuna River to… — lapsed, 5.5 km away
- Proposed Forest Diversion Land and Layout Plan of Retail Outlet on Hathin to… — forest land use approved, 5.9 km away
- Diversion of Forest Land for Access to Retail Outlet of Iocl on Aurangabad… — forest land use approved, 7.2 km away
- Approach access for Om Logistics Limited on Hodal Nuh road — more information requested, 7.8 km away
- Diversion of Forest land for approach access to M/s Ambe Engineers Private… — initial checks, 7.9 km away
- Palwal City & Surrounding Area Gas Distribution (Uttawar to HPCL Bhanguri CNG… — initial checks, 8 km away
More from Adani Total Gas Limited in Palwal
- Diversion of Protected Forest land for laying of 4" pipeline Along NH-919 from… — initial checks
- Palwal City & Surrounding Area Gas Distribution (Uttawar to HPCL Bhanguri CNG… — initial checks
- Establish of CNG station on Hodal Nuh road, LHS, MDR 132, Kheat no 756/2,… — forest land use approved
- 4" Natural Gas Pipeline from Palwal to Nuh — lapsed
- 4" Steel Pipeline From Palwal to Dhatir — lapsed
6 Adani Total Gas projects in Palwal
All 48 Adani Total Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.