Quick answers
What is this project?
Palwal City & Surrounding Area Gas Distribution (Uttawar to HPCL Bhanguri CNG Station Connectivity) is a proposed pipeline project in Firozpur Rajpat, Hathin, Palwal, Haryana. The site covers 1.4 acres.
Who is building it?
The applicant is Adani Total Gas Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Firozpur Rajpat, Hathin, Palwal, Haryana.
How big is it?
It has a stated cost of ₹9 lakh; a site of 1.4 acres and 1.4 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 29 Jun 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 30 Jun 2026 |
| Application filed | 29 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Adani Total Gas Limited |
| Land area | 1.4 acres (0.6 ha) |
| Forest land | 1.4 acres (0.6 ha) |
| Project cost | ₹9 lakh |
| Village / locality | Firozpur Rajpat |
| Taluk / tehsil | Hathin |
| District | Palwal |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-02927 |
In context
6 applications in Palwal since January 2022 are in the same category (Pipelines): 0 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Firozpur Rajpat, Hathin, Palwal, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed CBWTF by M/s SHREE PITAMBARA INCINERATOR LLP — under environmental review, 1.5 km away
- Proposed CBWTF by M/s SHREE PITAMBARA INCINERATOR LLP — cleared for impact study, 1.5 km away
- Diversion of Forest land for construction of Bye Pass road at Hathin — forest land use approved, 2.2 km away
- Expansion of Grain based distillery from 160 KLPD to 960 KLPD and Cogeneration… — environmental approval granted, 2.8 km away
- Laying of Drinking Water Pipe Line From Rennywal Chandhut Near Yamuna River to… — lapsed, 3.4 km away
- Diversion of Forest Land for Access to Retail Outlet of Iocl on Aurangabad… — forest land use approved, 3.4 km away
- Proposed Forest Diversion Land and Layout Plan of Retail Outlet on Hathin to… — forest land use approved, 3.6 km away
- DIVERSION OF FOREST LAND FOR ACCESS TO RETAIL OUTLET OF "M/s HINDUSTAN… — under forest review, 3.7 km away
More from Adani Total Gas Limited in Palwal
- Diversion of Protected Forest land for laying of 4" pipeline Along NH-919 from… — initial checks
- CNG STATION OF M/s ADANI TOTAL GAS LIMITED ON MDR-132 (HODAL TO NUH ROAD), AT… — in-principle approval, conditions pending
- Establish of CNG station on Hodal Nuh road, LHS, MDR 132, Kheat no 756/2,… — forest land use approved
- 4" Natural Gas Pipeline from Palwal to Nuh — lapsed
- 4" Steel Pipeline From Palwal to Dhatir — lapsed
6 Adani Total Gas projects in Palwal
All 48 Adani Total Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.