Quick answers
What is this project?
Laying of Drinking Water Pipe Line From Rennywal Chandhut Near Yamuna River to Various Mbs and Ibs is a lapsed water and irrigation project in Chandhat, Palwal, Haryana. The site covers 6.1 acres.
Who is building it?
The applicant is Sde Phe Palwal.
Has it been approved?
No. The application was lapsed on 1 Feb 2025, so it is no longer under consideration.
Where is it?
In Chandhat, Palwal, Haryana.
How big is it?
It has a stated cost of ₹13.6 crore; a site of 6.1 acres and 3.7 acres (1.5 ha) of forest land.
When was it filed?
The application was filed on 16 Dec 2024.
Project details
| Official title | Laying of Drinking Water Pipe Line From Rennywal Chandhut Near Yamuna River to Various Mbs and Ibs in District Palwal and Nuh |
|---|---|
| Status | Lapsed |
| Status since | 1 Feb 2025 |
| Application filed | 16 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Sde Phe Palwal |
| Land area | 6.1 acres (2.5 ha) |
| Forest land | 3.7 acres (1.5 ha) |
| Project cost | ₹13.6 crore |
| Village / locality | Chandhat |
| Taluk / tehsil | Palwal |
| District | Palwal |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-04280 |
In context
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandhat, Palwal, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Access to Retail Outlet of Iocl on Aurangabad… — forest land use approved, 1.7 km away
- Expansion of Grain based distillery from 160 KLPD to 960 KLPD and Cogeneration… — environmental approval granted, 2.5 km away
- Palwal City & Surrounding Area Gas Distribution (Uttawar to HPCL Bhanguri CNG… — initial checks, 3.4 km away
- Diversion of Forest land for construction of Bye Pass road at Hathin — forest land use approved, 3.7 km away
- Proposed Forest Diversion Land and Layout Plan of Retail Outlet on Hathin to… — forest land use approved, 4.3 km away
- Proposed CBWTF by M/s SHREE PITAMBARA INCINERATOR LLP — under environmental review, 4.4 km away
- Proposed CBWTF by M/s SHREE PITAMBARA INCINERATOR LLP — cleared for impact study, 4.4 km away
- CNG STATION OF M/s ADANI TOTAL GAS LIMITED ON MDR-132 (HODAL TO NUH ROAD), AT… — in-principle approval, conditions pending, 5.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.