Quick answers
What is this project?
Creation of 66KV D/C Line From Proposed 220KV Sub Station Sadhaura to 66KV Sub Station Laha With 0.4 Sq Inch Acsr Conductor is an approved project in Amli, Naraingarh, Ambala, Haryana. The site covers 101.5 acres.
Who is building it?
The applicant is Executive Engineer.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Oct 2025), as of 27 Nov 2026.
Where is it?
In Amli, Naraingarh, Ambala, Haryana.
How big is it?
It has a stated cost of ₹2.1 crore; a site of 101.5 acres and 1.9 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 10 Oct 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 Oct 2025 |
| Application filed | 10 Oct 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Executive Engineer |
| Land area | 101.5 acres (41.1 ha) |
| Forest land | 1.9 acres (0.8 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Amli |
| Taluk / tehsil | Naraingarh |
| District | Ambala |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-03755 |
In context
52 applications in Ambala since January 2022 are in the same category (Other): 3 approved, 12 filed or under review, and 37 withdrawn, lapsed or rejected. At 101.5 acres, this one is larger than 94% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amli, Naraingarh, Ambala, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Creation of 66KV D/C Line From Proposed 220KV Sub Station Sadhaura to 66KV Sub… — forest land use approved, 100 m away
- Creation of 66KV D/C Line From Proposed 220KV Sub Station Sadhaura to 66KV Sub… — forest land use approved, 100 m away
- Hotel with Banquet Hall — lapsed, 2.3 km away
- Diversion of Forest Land Proposed Hpcl Retail Outlet on Naraingarh to Bhareri… — forest land use approved, 3.8 km away
- New Roundabout at Ambli Junction on Bilaspur Sadhaura Naraingarh road SH-01 in… — lapsed, 3.9 km away
- Roundabout at Ambli Junction road SH-01 — more information requested, 3.9 km away
- Laying Di Pipe Line in Town Naraingarh for Phed — lapsed, 4 km away
- Diversion of Forest Land Proposed Hpcl Retail Outlet on Sahazadpur-Ambli Road… — forest land use approved, 5.2 km away
More from Executive Engineer in Ambala
- Creation of 66KV D/C Line From Proposed 220KV Sub Station Sadhaura to 66KV Sub… — forest land use approved
- Creation of 220kV D/C line with 0.5 Sq." Moose Conductor from 400kV PGCIL… — forest land use approved
- 3. Creation of LILO of 220kV S/C line from 220kV Tepla to 220kV S/Stn Madanpur… — forest land use approved
- Creation of 220kV D/C line from 400kv S/Stn PGCIL Nagal Panchkula to proposed… — forest land use approved
- Creation of 66KV D/C Line From Proposed 220KV Sub Station Sadhaura to 66KV Sub… — forest land use approved
- Creation of LILO of 220kV S/C line from 220kV Tepla to 220kV S/Stn Madanpur at… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.