Quick answers
What is this project?
Regularization of existing plant having Cold Rolled Mill (6Hi) unit for production of 200,000TPA Cold Rolled Coil and Continuous Galvanizing Line for production of 150,000 TPA Galvanized Plain Coil by M/s BMW Industries Limited at M-1, Large Sector Mauza- Adityapur Industrial Area, PO- Gamharia, Dist- Saraikela Kharsawan, Jamshedpur, Jharkhand is a proposed industrial project in Sidadih, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 10 acres.
Who is building it?
The applicant is Bmw Industries Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Jun 2024), as of 27 Nov 2026.
Where is it?
In Sidadih, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹378 crore and a site of 10 acres.
When was it filed?
The application was filed on 10 Apr 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 18 Jun 2024 |
| Application filed | 10 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Bmw Industries Limited |
| Land area | 10 acres (4 ha) |
| Project cost | ₹378 crore |
| Village / locality | Sidadih |
| Taluk / tehsil | Adityapur(Gamharia) |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00085 |
In context
47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10 acres, this one is smaller than 72% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sidadih, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 220 kV Underground Cable feeder from PGCIL/JUSNL Grid sub-station to Tata… — lapsed, 1.2 km away
- Proposed expansion of existing non-recovery type coke oven plant capacity from… — more information requested, 1.2 km away
- Proposed expansion of existing non-recovery type coke oven plant capacity from… — cleared for impact study, 1.2 km away
- 132 KV & 33 KV Underground Cable Feeder Under Gamharia Block From Pgcil Grid… — more information requested, 1.3 km away
- 0.5 MTPA Electrical Steel Complex — cleared for impact study, 1.3 km away
- Environment Clearance for Mini Blast Furnace (3x40m3) for the production of… — more information requested, 1.3 km away
- Environment Clearance for Mini Blast Furnace (3x40m3) for the production of… — withdrawn, 1.3 km away
- Environment Clearance for Mini Blast Furnace (3x40m3) for the production of… — lapsed, 1.3 km away
All 7 Bmw Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.