WithdrawnIndustry · Saraikela-Kharsawan, Jharkhand

Environment Clearance for Mini Blast Furnace (3x40m3) for the production of 99000 TPA Pig Iron, LD Convertor for production of 99000 TPA steel

Environment Clearance for Mini Blast Furnace (3x40m3) for the production of 99000 TPA Pig Iron, LD Convertor for production of 99000 TPA steel is a withdrawn industrial project in Barubad, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 4.3 acres. Its stated project cost is ₹38.1 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 7 Jul 2023).

See it on the live map All projects in Saraikela-Kharsawan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environment Clearance for Mini Blast Furnace (3x40m3) for the production of 99000 TPA Pig Iron, LD Convertor for production of 99000 TPA steel is a withdrawn industrial project in Barubad, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 4.3 acres.

Who is building it?

The applicant is Anjaneya Ispat Limited.

Has it been approved?

No. The application was withdrawn on 7 Jul 2023, so it is no longer under consideration.

Where is it?

In Barubad, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.

How big is it?

It has a stated cost of ₹38.1 crore and a site of 4.3 acres.

When was it filed?

The application was filed on 6 Jul 2023.

One of 4 filings for this project. The project's main page, with every filing and where each stands: Environment Clearance for Mini Blast Furnace (3x40m3) for the production of 99000 TPA…

Project details

Official titleEnvironment Clearance for Mini Blast Furnace (3x40m3) for the production of 99000 TPA Pig Iron, LD Convertor for production of 99000 TPA steel along with Billet Caster for production of 95000 TPA Billets, Hot Briquette Plant for Production capacity of 150000 TPA Briquettes and Gas recovery type Power Plant of 1.5 MW by M/s Anjaneya Ispat Limited at B6 to 10, 5th Phase, Adityapur Industrial Area, Gamharia, District-Seraikela Kharsawan, Jamshedpur-Jharkhand
StatusWithdrawn
Status since7 Jul 2023
Application filed6 Jul 2023
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantAnjaneya Ispat Limited
Land area4.3 acres (1.7 ha)
Project cost₹38.1 crore
Village / localityBarubad
Taluk / tehsilAdityapur(Gamharia)
DistrictSaraikela-Kharsawan
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00502

All filings for this project

This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 24 Jul 2023More information requested4.3 acres₹38.1 crore
Expansion filed 6 Jul 2023 (this page)Withdrawn4.3 acres₹38.1 crore
Early planning filed 6 Jul 2023Lapsed4.3 acres₹38.1 crore
Early planning filed 14 Mar 2023Lapsed4.3 acres₹38.1 crore

In context

47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.3 acres, this one is smaller than 94% of them.

21 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Barubad, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Anjaneya Ispat Limited in Saraikela-Kharsawan

All 6 Anjaneya Ispat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.