What is Developing? Open the mapMap

Cleared for impact studyIndustry · Saraikela-Kharsawan, Jharkhand

Proposed expansion of existing non-recovery type coke oven plant capacity from 24,000 TPA to 1,35,000 TPA

Proposed expansion of existing non-recovery type coke oven plant capacity from 24,000 TPA to 1,35,000 TPA is a proposed industrial project in Barubad, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 5.7 acres. Its stated project cost is ₹45.8 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 11 Feb 2026).

See it on the live map All projects in Saraikela-Kharsawan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed expansion of existing non-recovery type coke oven plant capacity from 24,000 TPA to 1,35,000 TPA is a proposed industrial project in Barubad, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 5.7 acres.

Who is building it?

The applicant is Anjaneya Ispat Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 11 Feb 2026), as of 27 Nov 2026.

Where is it?

In Barubad, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.

How big is it?

It has a stated cost of ₹45.8 crore and a site of 5.7 acres.

When was it filed?

The application was filed on 11 Feb 2026.

Project details

Official titleProposed expansion of existing non-recovery type coke oven plant capacity from 24,000 TPA to 1,35,000 TPA along with 10 MW capacity Waste Heat Recovery Boiler (WHRB) based Captive Power Plant at Plot Nos. NS-5(P), NS-31, V-1(P), Adityapur Industrial Area, 5th Phase, Mouza - Gamharia, P.S. Adityapur, District Seraikela-Kharsawan, Jamshedpur, Jharkhand, PIN-832108.
StatusCleared for impact study
Status since11 Feb 2026
Application filed11 Feb 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAnjaneya Ispat Limited
Land area5.7 acres (2.3 ha)
Project cost₹45.8 crore
Village / localityBarubad
Taluk / tehsilAdityapur(Gamharia)
DistrictSaraikela-Kharsawan
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-02043

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 29 Oct 2026More information requested5.7 acres₹45.8 crore
Early planning filed 11 Feb 2026 (this page)Cleared for impact study5.7 acres₹45.8 crore

In context

47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.7 acres, this one is smaller than 85% of them.

21 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Barubad, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Anjaneya Ispat Limited in Saraikela-Kharsawan

All 6 Anjaneya Ispat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.