What is Developing? Open the mapMap

Cleared for impact studyMining · Bokaro, Jharkhand

Proposed Production of 75,464 Cum Granite Gneiss Through Semi-Mechanised Opencast Mining Method With Maximum Excavation of 80,726 Cum Spread Over 5.24 Acres (2.12 Ha.)

Proposed Production of 75,464 Cum Granite Gneiss Through Semi-Mechanised Opencast Mining Method With Maximum Excavation of 80,726 Cum Spread Over 5.24 Acres (2.12 Ha.) is a proposed mining project in Chainpur, Chas, Bokaro, Jharkhand. The site covers 5.2 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Oct 2023).

See it on the live map All projects in Bokaro

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Production of 75,464 Cum Granite Gneiss Through Semi-Mechanised Opencast Mining Method With Maximum Excavation of 80,726 Cum Spread Over 5.24 Acres (2.12 Ha.) is a proposed mining project in Chainpur, Chas, Bokaro, Jharkhand. The site covers 5.2 acres.

Who is building it?

The applicant is Rajesh Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 16 Oct 2023), as of 27 Nov 2026.

Where is it?

In Chainpur, Chas, Bokaro, Jharkhand.

How big is it?

It has a stated cost of ₹1 crore and a site of 5.2 acres.

When was it filed?

The application was filed on 16 Oct 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Production of 75,464 Cum Granite Gneiss Through Semi-Mechanised Opencast Mining…

Project details

Official titleProposed Production of 75,464 Cum Granite Gneiss Through Semi-Mechanised Opencast Mining Method With Maximum Excavation of 80,726 Cum Spread Over 5.24 Acres (2.12 Ha.) in Village- Chainpur, Thana- Balidih, Thana No.- 37, District Bokaro, State- Jharkhand for M/S Shree Bhole Minerals
StatusCleared for impact study
Status since16 Oct 2023
Application filed16 Oct 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRajesh Singh
Land area5.2 acres (2.1 ha)
Project cost₹1 crore
Village / localityChainpur
Taluk / tehsilChas
DistrictBokaro
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00280

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Nov 2024Environmental approval granted5.2 acres₹1 crore
Early planning filed 16 Oct 2023 (this page)Cleared for impact study5.2 acres₹1 crore

In context

93 applications in Bokaro since January 2022 are in the same category (Mining): 76 approved, 3 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 5.2 acres, this one is smaller than 60% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 16 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.

Where it is

Chainpur, Chas, Bokaro, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.