What is Developing? Open the mapMap

Environmental approval grantedMining · Bokaro, Jharkhand

Proposed Production of 75,464 Cum Granite Gneiss Through Semi-Mechanised Opencast Mining Method With Maximum Excavation of 80,726 Cum Spread Over 5.24 Acres (2.12 Ha.)

Proposed Production of 75,464 Cum Granite Gneiss Through Semi-Mechanised Opencast Mining Method With Maximum Excavation of 80,726 Cum Spread Over 5.24 Acres (2.12 Ha.) is an approved mining project in Chainpur, Chas, Bokaro, Jharkhand. The site covers 5.2 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 22 Jan 2025).

See it on the live map All projects in Bokaro

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Production of 75,464 Cum Granite Gneiss Through Semi-Mechanised Opencast Mining Method With Maximum Excavation of 80,726 Cum Spread Over 5.24 Acres (2.12 Ha.) is an approved mining project in Chainpur, Chas, Bokaro, Jharkhand. The site covers 5.2 acres.

Who is building it?

The applicant is Rajesh Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 22 Jan 2025), as of 27 Nov 2026.

Where is it?

In Chainpur, Chas, Bokaro, Jharkhand.

How big is it?

It has a stated cost of ₹1 crore and a site of 5.2 acres.

When was it filed?

The application was filed on 20 Nov 2024.

Project details

Official titleProposed Production of 75,464 Cum Granite Gneiss Through Semi-Mechanised Opencast Mining Method With Maximum Excavation of 80,726 Cum Spread Over 5.24 Acres (2.12 Ha.) in Village- Chainpur, Thana- Balidih, Thana No.- 37, District Bokaro, State- Jharkhand for M/S Shree Bhole Minerals
StatusEnvironmental approval granted
Status since22 Jan 2025
Application filed20 Nov 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRajesh Singh
Land area5.2 acres (2.1 ha)
Project cost₹1 crore
Village / localityChainpur
Taluk / tehsilChas
DistrictBokaro
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00758

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Nov 2024 (this page)Environmental approval granted5.2 acres₹1 crore
Early planning filed 16 Oct 2023Cleared for impact study5.2 acres₹1 crore

In context

93 applications in Bokaro since January 2022 are in the same category (Mining): 76 approved, 3 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 5.2 acres, this one is smaller than 60% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 16 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.

Where it is

Chainpur, Chas, Bokaro, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.