ENVIRONMENTAL CLEARANCE TO ENHANCE THE PRODUCTION OF M.S INGOT/BILLET FROM 24000 TPA TO 105600 TPA BY ADDITION OF 3X 8 MT INDUCTION FURNACE WITH EXISTING 1X 8MT INDUCTION FURNACE

ENVIRONMENTAL CLEARANCE TO ENHANCE THE PRODUCTION OF M.S INGOT/BILLET FROM 24000 TPA TO 105600 TPA BY ADDITION OF 3X 8 MT INDUCTION FURNACE WITH EXISTING 1X 8MT INDUCTION FURNACE is a lapsed industrial project in Bokaro Steel City, Chas, Bokaro, Jharkhand. The site covers 3.5 acres. Its stated project cost is ₹38.1 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Bokaro

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

ENVIRONMENTAL CLEARANCE TO ENHANCE THE PRODUCTION OF M.S INGOT/BILLET FROM 24000 TPA TO 105600 TPA BY ADDITION OF 3X 8 MT INDUCTION FURNACE WITH EXISTING 1X 8MT INDUCTION FURNACE is a lapsed industrial project in Bokaro Steel City, Chas, Bokaro, Jharkhand. The site covers 3.5 acres.

Who is building it?

The applicant is Indrani Steels Private Limited.

Has it been approved?

No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.

Where is it?

In Bokaro Steel City, Chas, Bokaro, Jharkhand.

How big is it?

It has a stated cost of ₹38.1 crore and a site of 3.5 acres.

When was it filed?

The application was filed on 24 Apr 2024.

Project details

Official titleENVIRONMENTAL CLEARANCE TO ENHANCE THE PRODUCTION OF M.S INGOT/BILLET FROM 24000 TPA TO 105600 TPA BY ADDITION OF 3X 8 MT INDUCTION FURNACE WITH EXISTING 1X 8MT INDUCTION FURNACE ALONG WITH CCM 4/6 AND PROPOSED ROLLING MILL WITH CAPACITY 102630 TPA AND SLAG CRUSHER OF CAPACITY 10 TPH M/S INDRANI STEEL PRIVATE LIMITED AT Phase- III/A 4(P), Industrial Area Balidih, Bokaro Steel City, Jharkhand-827014
StatusLapsed
Status since29 Oct 2024
Application filed24 Apr 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantIndrani Steels Private Limited
Land area3.5 acres (1.4 ha)
Project cost₹38.1 crore
Village / localityBokaro Steel City
Taluk / tehsilChas
DistrictBokaro
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00821

In context

27 applications in Bokaro since January 2022 are in the same category (Industry): 16 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.5 acres, this one is smaller than 78% of them.

26 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bokaro Steel City, Chas, Bokaro, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.