What is Developing? Open the mapMap

LapsedIndustry · Bokaro, Jharkhand

Ferro Alloys Plant (Greenfield Project) for production of 32,400 TPA Ferro Alloys (Silico Manganese) through installation of 2x9 MVA Submerged Arc Furnaces by M/s Om Shivay Steel & Power Pvt. Ltd. at Plot No. IVD-6 (P), Bokaro Industrial Area Balidih, Village: Gorabali, District: Bokaro, Jharkhand

Ferro Alloys Plant (Greenfield Project) for production of 32,400 TPA Ferro Alloys (Silico Manganese) through installation of 2x9 MVA Submerged Arc Furnaces by M/s Om Shivay Steel & Power Pvt. Ltd. at Plot No. IVD-6 (P), Bokaro Industrial Area Balidih, Village: Gorabali, District: Bokaro, Jharkhand is a lapsed industrial project in Bokaro Steel City, Chas, Bokaro, Jharkhand. The site covers 4 acres. Its stated project cost is ₹46.2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Bokaro

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Ferro Alloys Plant (Greenfield Project) for production of 32,400 TPA Ferro Alloys (Silico Manganese) through installation of 2x9 MVA Submerged Arc Furnaces by M/s Om Shivay Steel & Power Pvt. Ltd. at Plot No. IVD-6 (P), Bokaro Industrial Area Balidih, Village: Gorabali, District: Bokaro, Jharkhand is a lapsed industrial project in Bokaro Steel City, Chas, Bokaro, Jharkhand. The site covers 4 acres.

Who is building it?

The applicant is Om Shivay Steel & Power Private Limited.

Has it been approved?

No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.

Where is it?

In Bokaro Steel City, Chas, Bokaro, Jharkhand.

How big is it?

It has a stated cost of ₹46.2 crore and a site of 4 acres.

When was it filed?

The application was filed on 5 Jul 2023.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Ferro Alloys Plant (Greenfield Project) for production of 32,400 TPA Ferro Alloys…

Project details

Official titleEstablishment of Ferro Alloys Plant (Greenfield Project) for production of 32,400 TPA Ferro Alloys (Silico Manganese) through installation of 2x9 MVA Submerged Arc Furnaces by M/s Om Shivay Steel & Power Pvt. Ltd. at Plot No. IVD-6 (P), Bokaro Industrial Area Balidih, Village: Gorabali, District: Bokaro, Jharkhand
StatusLapsed
Status since29 Oct 2024
Application filed5 Jul 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantOm Shivay Steel & Power Private Limited
Land area4 acres (1.6 ha)
Project cost₹46.2 crore
Village / localityBokaro Steel City
Taluk / tehsilChas
DistrictBokaro
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00486

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 13 Jul 2023Environmental approval granted4 acres₹46.2 crore
New project filed 6 Jul 2023Withdrawn4 acres₹46.2 crore
Early planning filed 5 Jul 2023 (this page)Lapsed4 acres₹46.2 crore

In context

27 applications in Bokaro since January 2022 are in the same category (Industry): 16 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4 acres, this one is smaller than 74% of them.

26 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bokaro Steel City, Chas, Bokaro, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Om Shivay Steel & Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.