Cleared for impact studyIndustry · Bokaro, Jharkhand

Greenfield Plant for 10,00,000 TPA Pickling Line with other facilities such as HR Slitter, Cut-to-Length, Coil Preparation Line by BMW Industries Limited at Plot No. IV/B-1 (P), Phase IV, Balidih Industrial Area, Bokaro Steel City, Dist. Bokaro – 827014, Jharkhand

Greenfield Plant for 10,00,000 TPA Pickling Line with other facilities such as HR Slitter, Cut-to-Length, Coil Preparation Line by BMW Industries Limited at Plot No. IV/B-1 (P), Phase IV, Balidih Industrial Area, Bokaro Steel City, Dist. Bokaro – 827014, Jharkhand is a proposed industrial project in Bokaro Steel City, Chas, Bokaro, Jharkhand. The site covers 4.8 acres. Its stated project cost is ₹85 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 30 Apr 2025).

See it on the live map All projects in Bokaro

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield Plant for 10,00,000 TPA Pickling Line with other facilities such as HR Slitter, Cut-to-Length, Coil Preparation Line by BMW Industries Limited at Plot No. IV/B-1 (P), Phase IV, Balidih Industrial Area, Bokaro Steel City, Dist. Bokaro – 827014, Jharkhand is a proposed industrial project in Bokaro Steel City, Chas, Bokaro, Jharkhand. The site covers 4.8 acres.

Who is building it?

The applicant is Bmw Industries Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 30 Apr 2025), as of 27 Nov 2026.

Where is it?

In Bokaro Steel City, Chas, Bokaro, Jharkhand.

How big is it?

It has a stated cost of ₹85 crore and a site of 4.8 acres.

When was it filed?

The application was filed on 11 Mar 2025.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Greenfield Plant for 10,00,000 TPA Pickling Line with other facilities such as HR…

Project details

Official titleEstablishment of Greenfield Plant for 10,00,000 TPA Pickling Line with other facilities such as HR Slitter, Cut-to-Length, Coil Preparation Line by BMW Industries Limited at Plot No. IV/B-1 (P), Phase IV, Balidih Industrial Area, Bokaro Steel City, Dist. Bokaro – 827014, Jharkhand
StatusCleared for impact study
Status since30 Apr 2025
Application filed11 Mar 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantBmw Industries Limited
Land area4.8 acres (2 ha)
Project cost₹85 crore
Village / localityBokaro Steel City
Taluk / tehsilChas
DistrictBokaro
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-01422

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 21 Apr 2026Environmental approval granted4.8 acres₹85 crore
New project filed 6 Oct 2025Environmental approval granted4.8 acres₹85 crore
Early planning filed 11 Mar 2025 (this page)Cleared for impact study4.8 acres₹85 crore

In context

27 applications in Bokaro since January 2022 are in the same category (Industry): 16 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.8 acres, this one is smaller than 63% of them.

26 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bokaro Steel City, Chas, Bokaro, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

3 Bmw Industries projects in Bokaro
All 7 Bmw Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.